Search Permits
246,803 results
Add a 90a breaker to existing main panel, install a 125a sub panel on the opposite outside wall of the house, run aluminum #2 2-2-2-4 SER Cable through the attic to it, and install a 50a and 20a plug to breakers in the sub panel
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install battery backup system AC coupled with existing solar
Convert existing office space to quick casual restaurant. Deferred hood AFES.
Pre-fabricated Guard Booth with foundations
LANDSEA HOMES 35-1500 - new 2002 S.F. single-family home for construction with covered patio option. New water and electric meters. Special inspections required for post-installed anchors in PT slab. Truss Calcs deferred. Special inspection certificate for energy. Addenda MST24-21768 Replace insulation with blown in cellulose, updated vent calculations, revise roof plans, remove additional attic scuttle/access from garage, insulation at open attic, some minor electrical, updated energy report an
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Repair existing foundation including installation of helical piles for foundation stabilization. Type V-B construction. Special inspections required for helical piles and/or GFRP reinforcing installation. Minimum required building inspections: Footing, stem, and final.
Install circuit for Oven
Installation of two (2) illuminated channel letter signs. 12 sq ft each - SOUTH ENTRANCE
Install (1) 144 sf Illuminated pan channel building sign with logo CAMPERS INN RV.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
TAYLOR MORRISON #3517 - New 1832 SF single story residence with a 2 car garage and a 2+ car garage option. Built at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs. See MST23-15066 for parcel a,b,d,e of Hawes crossing. Addenda MST25-01482 Add Parcel H & F information: Revised parcel A, D, B & E information. Square footages updated for both MST23-15066 & MST25-01482. Ref: MST26-07844 for 2024 code update.
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
new building - engineering, landscape, architectural, structural, mech / plumb, electrical
Installing a shut off gas valve in a recessed box moving it 3 inches in laundry room.
Verification of existing Suite 13 to obtain a Certificate of Occupancy
Running new outdoor electrical high-voltage from the side of the house, underground and feeding into a pergola structure to also install and power the following: 3 high-voltage outlets, low voltage transformer, ceiling fan, 2 automatic rolling shades.
Install manufactured home in ground set with utilities, 100 amp, gas, tie downs, greenboard skirting, heat pump and attached 18x42 awning. 2027 Champion 15700PHA007061A
This contract includes the installation, termination, and testing of fire alarm devices required for the protection of Hermosa Vista Elementary School.
Inground Swimming Pool
Install (1) set of illuminated pan channel letters
Installing a 11'2"x34'3" Park Model above ground with Utilities.
Park Model Set with Mini split, Awning, and Vinyl skirting
Fabrication and installation of business identification signage.
Installation of a residential 13D sprinkler system in a care home
Adding a spa to an existing pool andding a jumping feature and a new stair way ro a slide
Installation of a dedicated function sprinkler monitoring system with attic heat detection
Install One (1) 3" Deep Illuminated PCL Building Sign
adding battery to existing system