Search Permits
246,803 results
Enclose existing 200 Sq Ft patio enclosure to livable space, including electrical and new mini-split system. VB construction. Minimum required building inspections: Footing, stem, strap/shear frame, mechanical rough in, electric rough in, insulation, drywall shear, electrical final, mechanical final and final.
Install 3 illuminated wall signs and install tenant panels in existing monument sign
Install an Analox AX 60+ CO2 detection system. CO2 tank is existing. Reviewed as noted.
PLUMBING PERMIT TO REPLACE EXISITING WET SPACE WITH NEW SHOWER IN HALL BATHROOM, INCLUDING NEW VALVE AND PREFABRICATED ARCYLIC WALLS. NO STRUCTRUAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
New 299 SF detached pool gazebo. Main house under construction PMT25-15629. Special Inspections required for: Steel/Masonry construction and epoxy anchorage.
Installation of high pile combustible storage racking. Special inspection for post installed anchoring. Results in CoC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESU
Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction
Building a 10x8 in ground Spa
CONSTRUCT A 392 SF SWIMMING POOL & 49 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 110-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER, 15-FT OF 1.5-IN PE GAS LINE TO 75K BTU BBQ, 10-FT OF 1.5-IN TO 40K BTU GRIDDLE. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS. COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURE
Assisted sober living facility, Group R-4 condition 1 occupancy, 10 maximum occupants all capable of self-preservation. Facility not equipped with fire sprinklers.
Assisted sober living facility, Group R-4 condition 1 occupancy, 9 maximum occupants all capable of self-preservation. Facility equipped with fire sprinklers. Ref: BLD2010-04185 for fire sprinklers.
Construction of 770 sq. ft. detached Garage on monolithic concrete footing with 50-amp electrical subpanel service. Unconditioned space, no plumbing.
OPEN DURING REMODEL SIGNS
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 15-FT X 34-FT ABOVE GROUND SET CAVCO MH SERIAL NO. CAV110AZ26-27661A WITH A/C AT REAR. NO GAS. ONE ATTACHED 12-FT X 34-FT AWNING PER ICCESR NO. 1398. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MIN TWO 9-FT X 18-FT PAVED 2-INCH ASPHALT OR 4-INCH CONCRETE UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK ONE PARKING SPACE REQUIRED TO BE COVERED. 57.9-FT X 38-FT INTERIOR LOT. MIN SETBACKS: 5-FT FRONT, 3-FT REAR, 3-FT SIDES.
Replacement of 3/4" backflow Assembly located in the pool pump room INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
PBI - ELECTRICAL - Like for like replacement of the 4 meter pak panel supplying power to units #25, #26, #27, & #28. There will be no change in electrical loads/amps. Electrical panel replacement will comply with 2023 NEC.
Install one set of pan channel letters south elevation - 101 sq ft - THE WAVE PILATES AND WELLNESS STUDIO - west elevation logo box - LOGO - 26 sq ft.
Install nonilluminated lettering on monument sign. REF: PMT25-01195 civil improvements for monument sign construction. Results in CofC.
Exterior modification to existing, type VB construction, A-2 occupancy Korean BBQ restaurant. Modification include demo of exterior decorate Vigas around bldg, log wall finish adjacent to chimney and false windows to be removed at east elevation, modification of parapet at east wall elevation above entry, and north and south elevation. New stucco patch, paint and revised tops of parapet walls. Reviewed with Stips - Building signs by separate permit. REF: PMT26-10684 Interior TI. Results in CofC.
New 15'D x 17'W x 9'H Freestanding 4K Aluminum Solid-Roof Shade Structure w Electrical
This submittal contains information for tenant improvements to an existing spec warehouse building, including 14,701 sf. New office space and 12,897 sf. An open craft area. Scope of work includes an addition of offices, conference rooms, employee areas, and toilets. No high-piled storage or hazardous materials. Deferred fire sprinklers and fire alarm.
Open a new office with Removal of Walk in Cooler. The preious tenant was a retailer as well so COO is the same. We just need to get permit done so we can get a sign hung outside.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Install of (3) 10ftx10ft new concrete equipment pads for future equipment in existing type III-B, group B and F-1 occupancy bldg. Special inspection req. concrete and anchor. Results in CofC.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Work Will include saw cutting concrete toward the fence (about 14 ft diagonally) to reach dirt, dig down roughly 20-24 inches, and place a gas (2") line in trench. trench will be roughly 125-150ft total.
Install one (1) front illuminated pan channel letter sign 46 sq ft - LIFEWORK
Fire Alarm Dialer: Installation of a fire alarm dialer with up to 5 devices – no plans required. Installation shall comply with the City of Mesa codes (IFC, NEC and NFPA 72). Fire inspection required.
This project is an interior tenant improvement to a 7,024 s.f. grey shell which includes dining, kitchen, restrooms, and support spaces. Equipment will be installed within the existing 2,800 s.f. covered patio. New electrical, mechanical, and structural will be included in the scope of work. No parking or shell building modifications proposed.