Search Permits
246,803 results
Install cold spray booth with dust collector. Work includes electrical, helium and nitrogen gas connections to exterior tanks.
Add a wall and door to close off current den to a 3rd bedroom. Cabinets will be removed and a wall with sliding closet door will be added to create a closet area for 3rd bedroom. No electrical or load bearing wall changes are needed to create the additional bedroom.
potholing utilities for design and discovery
Assisted living adult foster care facility, Group R-5 occupancy, 4 maximum occupants incapable of self-preservation. Facility not equipped with fire sprinklers.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Partial demolition of commercial building
Installation of one set of front lit pan channel letters and logo box. White, black, and red acrylic faces. 3" black returns, 3/4" black trim cap. Illuminated with white LEDS for 'RONIN' and red LEDs for 'GAMES'. Flush mounted to the building secured with anchors, bolts, and screws.
TENANT IMPROVEMENT PROJECT FOR FARNSWORTH ORTHOPEDIC PHYSICAL THERAPY, A MEDICAL PROFESSION SERVICE OFFICE. TENANT SHALL OCCUPY 3 CURRENTLY VACANT SUITES (101, 102, 103) AS ONE SUITE. MOST OF THE DEMOLITION AND NEW CONSTRUCTION WILL BE AT SUITE 101 WHERE THE EXISTING DRYWALL CEILING AND LIGHT FIXTURES SHALL BE REMOVED AND REPLACED WITH NEW ACOUSTICAL CEILING WITH LED LIGHT FIXTURES, NEW HVAC UNITS AND DUCTWORKS, NEW OFFICES ND CABINETS. MOST OF EXISTING SUITES 102 AND 103 SHALL REMAIN, INCLUDING
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Complete the following work to achieve conversion from grass to granite in the areas identified on the rendering. All lawn areas along the West side of the wall will be converted. Along the East side of the wall a 3 Ft. buffer will be added with granite covering the space and concrete curbing to separate the new granite area from the grass that remains. Plants will not be added in this small, buffer space.
Installation of temporary construction electrical power service for The Den Housing and Candlewood Suites projects located at 2630 W. Rio Salado Parkway, Mesa, AZ. Scope includes temporary service equipment, electrical distribution panels, conduits, wiring, and associated connections per the attached engineer-stamped electrical plans. This permit is to be associated with the existing temporary construction trailer permit.
Installation of a new Fire Sprinkler Monitoring System.
Residential Roof-Mount Solar Installation
Installing a 20' x 18' Pergola in backyard.
Project scope consists of 2 story building outside of tenant space.
ROW Permit Needed to Seal Off Drainage Pipe at North End of Property. Review by Engineering Only
Installation of one set of front lit pan channel letters, logo box, and acrylic letters. Green, gold, and white faces with 3" black returns, 3/4" black trim cap, and illuminated with white LEDs. Flush mounted to the building and secured with anchors, bolts, and screws.
BUILD AN IN-GROUND POOL SPA
Helical and Push Pier Installation
Selective interior demolition of the existing labor, delivery, and recovery (LDR) department to prepare the space for future renovation.
Electrical verification and inspection of existing multi-suite meter sockets at 825 W University Drive for the purpose of obtaining municipal clearance so SRP can tag the meters and activate service. No new construction, panel upgrades, or service entrance modifications are included. Suite numbers to be listed on the permit: 101, 102, 103.
IN GROUND POOL WITH EQUIPMENT
Bookmark to replace Village medical
Installation of a Tesla Wall Connector (EV charger).
SHEA HOMES #5016 - NEW 3505 SF TWO STORY RESIDENCE WITH A 3 CAR GARAGE AT AVALON CROSSING. INCLUES MANY ELEVATION OPTIONS. NEW WATER, ELECTRIC AND GAS METERS. Addenda per MST25-12445. Revised and added sheets for foundation slab depth for phase 2 foundations. SPECIAL INSPECTION FOR POST TENSION SLABS. See permit MST26-06688 for addenda - Code update 2024.
Shower Remodel in Hall and Master Bathrooms - Replace existing wet space with new shower including new valve and prefabricated acrylic walls. No structural changes - will tie into existing piping. No change to overall square footage. No electrical work.
IN GROUND POOL WITH EQUIPMENT
Sign A Front lit Channel letters and Sign B EMC display upgrade on existing base
Installation of 13.50 kWh Battery and Main Panel Upgrade to 225A.