Search Permits
245,623 results
Pavion to provide new access control panel that ties into existing door contact and maglock. pavion will install a new mullion card reader and main entrance. SUITE 103 & 104
Installation of storage racking in new building. Special Inspections Required: post installed anchors. Approved as noted. Results in CofC.
Installation of one vertical 120-gallon propane tank with twin stage regulator, secured to the wall. Connecting to existing approved gas stub, reference MST19-15979, addenda MST25-06778 for propane tank approval and addenda MST26-03580 for 2024 IRC Code update. Gas tank to be installed per 2024 IFGC & FPD 6104.1.
CONSTRUCT A 384 SF SWIMMING POOL & 49 SF SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
13,000 SF LUNCH TENT WITH GENERATOR ELECTRIC. JE Dunn is looking to install a 164’ X 82’ lunch tent. In the location show on the site map. The tent will be onsite for approximately 180 days. There will be two generator powering the electric to the lunch tent. Once completed, and no later than 180 days, the tent will be disassembled and returned to the leasing company.
PLUMBING PERMIT TUB TO SHOWER CONVERSION IN HALL BATHROOM. REPLACE EXISTING WET SPACE WITH NEW SHOWER INCLUDING NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
INSTALLATION OF 120-FT OF 2-IN PE GAS LINE BURIED 18-IN WITH 14-GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES ARE TO BE INSTALLED PER 2024 IFGC AND COM GAS REQUIREMENTS. CONTACT COM GAS ENGINEERING AT 480-644-2909 TO DETERMINE IF THE METER NEEDS TO BE UPGRADED. NO RECORD ON FILE FOR EXISTING POOL. POOL WAS CONSTRUCTED PRIOR TO PERMIT RECORD KEEPING.
Install an Emergency Responder Radio Coverage System (ERRCS), including signal booster, donor antenna, indoor antennas, distributed antenna system components, coaxial cabling, and associated equipment to provide required emergency responder radio coverage. Approved with stipulations.
Adding an additional playroom and bedroom & bath. Remodel kitchen and enclose portion of existing patio. add additional light well to basement.
Approx 19'x19' Master bedroom addition to add dual his/hers walk in closets, exterior backyard egress, laundry closet
The scope of this project consists of constructing a new Boeing warehouse facility and associated improvements.
Install (1) 110.86 sf halo illuminated pan channel letters AJ'S FINE FOODS. Install (1) 14.67 sf halo illuminated pan channel letters FINE AJ'S FOODS.
EXISTING SWIMMING POOL REMODEL OF 400 SF. NO NEW SQUARE FEET. EXISTING RAISED DECKING TO BE REMOVED AND EXISTING POOL TO BE RELOCATED. DISCONNECT AND CAPPING OF POOL PLUMBING AND ELECTRICAL CONDUIT FROM EXISTING POOL. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS
Installation of 13.50 kWh Battery
AFP26-14602 Electrical: dock door power relocation,RWAY006A relocation Dojo Welder Removal and relocation refrigerant reclaim equipment (2) test bench power supplies Plumbing: natural gas piping to dojo area cold water extension to dojo area removal of existing piping to existing dojo location that is being relocated. compressed air piping to line 1 work station refrigerant piping extension to line 1 refrigerant fill stations. distribution piping for line 1 refrigerant reclaim piping system. ex
Solar PV Roof-mount, 23.600 kW 40 modules
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
RESIDENTIAL ADDITION & REMODEL TO FIRE DAMAGED STRUCTURE WITH MECHANICAL, PLUMBING AND ELECTRICAL IMPROVEMENTS. NEW LIVABLE AREA 2,307 SF, NEW 441 SF 2-CAR GARAGE, NEW 430 SF COVERED PATIO. INCLUDES A NEW 200A ELECTRIC SERVICE PANEL. Please reference COB21-00216
Like-for-like, sub-panel replacement. Same location.
Adding shower to half bath
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING WHOLE HOUSE CAT6 AND COAX 1X DUAL PORT (CAT6 & COAX) 1X DATA PORT (CAT6) 1X SHORT DONDUIT
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING WHOLE HOUSE CAT6 AND COAX 1X DUAL PORT (CAT6 & COAX) 1X DATA PORT (CAT6) 1X SHORT DONDUIT
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING WHOLE HOUSE CAT6 AND COAX 1X DUAL PORT (CAT6 & COAX) 1X DATA PORT (CAT6) 1X SHORT DONDUIT
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING WHOLE HOUSE CAT6 AND COAX 5X DUAL PORT (CAT6 & COAX) 1X CONDUIT
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ INSTALL 16 ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 7.04KW
Please do not request inspections under this permit until 2 business days after permit issuance.heavy up from 150 AMPS to 200 AMPS
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING WHOLE HOUSE CAT6 AND COAX 2X DUAL PORT (CAT6 & COAX) 1X CONDUIT 1X DATA PORT (CAT6) 1X COAX (COAX)
Please do not request inspections under this permit until 2 business days after permit issuance.Replace 200A overhead line side service cable due to tree damage.
Please do not request inspections under this permit until 2 business days after permit issuance.