PermitDig

Search Permits

245,623 results

INSTALL REPLACEMENT GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.

250 VESEY STREET, Manhattan
85KSep 30

INTERIOR RENOVATION FOR ONE FAMILY DWELLING HOUSE. NO CHANGE IN USE OF EGRESS & OCCUPANCY.

134-39 224 STREET, Queens
43KSep 30

RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

1153 71 STREET, Brooklyn
150KSep 30

Modifications to the existing sprinkler system on the 32nd Floor (Dr. Wiser Office), as per plans. No change to use, egress, or occupancy.

885 THIRD AVENUE, Manhattan
85KSep 30

INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

2625 3 AVENUE, Bronx
120KSep 30

APPLICATION FIELD FOR REPLACEMENT OF EXISTING ROOFING MATERIALS ON EXISTING INSULATED BASE .NO CHANGE IN USE , EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

89-40 151 AVENUE, Queens
60KSep 30

NO-WORK COMPLIANCE FILING TO DOCUMENT EXISTING EXTERIOR CONDITIONS FOLLOWING THE PREVIOUS REMOVAL OF THE UNSAFE REAR DECK AT EXP 3. FILING ADDRESSES PARTIAL VACATE ORDER X146/17, ISSUED 09/27/2017 COMPLAINT NO. 2250122 FOR A REAR DECK PER PLANS.

553 FOX STREET, Bronx
3KSep 30

DUE TO FIRE INCIDENT INTERIOR RENOVATION WORK ACCORDING TO PLAN. NO CHANGE IN USE, Egress or Occupancy. SUBSEQUENT FILE FOR PLUMBING FILLED SEPARATELY.

343 EAST 28 STREET, Brooklyn
172KSep 30

Interior renovation for Capital One Bank. No change to use, egress or occupancy.

731 LEXINGTON AVENUE, Manhattan
324KSep 30

Interior fit-out of tenant space of existing commercial space on the first floor. Installation of new floors. No change to use, egress or occupancy.

1211 FLATBUSH AVENUE, Brooklyn
40KSep 30

RENOVATE APARTMENTS 2B AND 3B ON 3RD AND 4TH LEVEL OF THIS BASEMENT AND FOUR STORY HCA BUILDING.

40 WEST 87 STREET, Manhattan
105KSep 30

PROPOSED INTERIOR RENOVATION, INSTALLATION OF SPLIT AC UNITS ON 2ND FLOOR(APT. #2F,2R), REMOVED EX. OIL TANK AND GAS BOILER ON CELLAR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.

71-02 GRAND AVENUE, Queens
70KSep 30

INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.

115 SHARROTTS ROAD, Staten Island
101KSep 30

This PL work filed associated with the interior renovation for new kitchen and bathroom fix, no change of use, egress or occupancy under this filing

21 FULTON STREET, Manhattan
112KSep 30

FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

333 FREEBORN STREET, Staten Island
29KSep 30

INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

43-44 164 STREET, Queens
Sep 30

REPLACE GAS/OIL BURNER ON EXISTING BOILER.

112 RICHMOND HILL ROAD, Staten Island
393KSep 30

REPLACE GAS TRAIN AND GAS CONNECTION TO REPLACEMENT GAS/OIL BURNER.

112 RICHMOND HILL ROAD, Staten Island
8KSep 30

installation of outrigger for facade repair.

210 EAST 29 STREET, Manhattan
Sep 30

Renovation of existing garage: removal of the windows, new roof assembly over existing roof assembly, new roof deck, repair of exterior wall and/or replacement where necessary.

62-46 GAR 61 STREET, Queens
80KSep 30

FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

40-36 204 STREET, Queens
27KSep 30

Installation of new partitions, doors, ceilings and finishes on the 20th and 21st floors (TD Securities- 21st and 22nd Marketing Floors) as per plans. No change to use, egress or occupancy.

125 PARK AVENUE, Manhattan
8.9MSep 30

SPRINKLER MODIFICATIONS TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

115 BROADWAY, Manhattan
65KSep 30

HEREBY FILING GENERAL CONSTRUCTION WORK AT 30TH FLOOR UNIT 30J AS PER PLANS.

60 WEST 66 STREET, Manhattan
130KSep 30

Architectural modifications taking place on the 31st floor as per plans filed herewith. No change in use, egress or occupancy.

555 MADISON AVENUE, Manhattan
56KSep 30

INTERIOR RENOVTION OF EXISTING 4 FAMILY HOUSE PER PLAN FILED. MODIFY NON-LOAD BEARING PARTITIONS. REPAIR FLOOR, WALL AND PAINTS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

838 40 STREET, Brooklyn
250KSep 30

Non bearing partitions and finishes removal in suite 1001 on 10th fl. No change in use, egress or occupancy

381 PARK AVENUE SOUTH, Manhattan
5KSep 30

Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.

12-27 148 STREET, Queens
36KSep 30

PLUMBING MODIFICATIONS TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

115 BROADWAY, Manhattan
110KSep 30

Installation of approximately 32.87 linear feet of temporary 8-foot-high wood construction fence along the 7th Avenue frontage

191 7 AVENUE, Manhattan
5KSep 30