Search Permits
245,623 results
INSTALL REPLACEMENT GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
INTERIOR RENOVATION FOR ONE FAMILY DWELLING HOUSE. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Modifications to the existing sprinkler system on the 32nd Floor (Dr. Wiser Office), as per plans. No change to use, egress, or occupancy.
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
APPLICATION FIELD FOR REPLACEMENT OF EXISTING ROOFING MATERIALS ON EXISTING INSULATED BASE .NO CHANGE IN USE , EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
NO-WORK COMPLIANCE FILING TO DOCUMENT EXISTING EXTERIOR CONDITIONS FOLLOWING THE PREVIOUS REMOVAL OF THE UNSAFE REAR DECK AT EXP 3. FILING ADDRESSES PARTIAL VACATE ORDER X146/17, ISSUED 09/27/2017 COMPLAINT NO. 2250122 FOR A REAR DECK PER PLANS.
DUE TO FIRE INCIDENT INTERIOR RENOVATION WORK ACCORDING TO PLAN. NO CHANGE IN USE, Egress or Occupancy. SUBSEQUENT FILE FOR PLUMBING FILLED SEPARATELY.
Interior renovation for Capital One Bank. No change to use, egress or occupancy.
Interior fit-out of tenant space of existing commercial space on the first floor. Installation of new floors. No change to use, egress or occupancy.
RENOVATE APARTMENTS 2B AND 3B ON 3RD AND 4TH LEVEL OF THIS BASEMENT AND FOUR STORY HCA BUILDING.
PROPOSED INTERIOR RENOVATION, INSTALLATION OF SPLIT AC UNITS ON 2ND FLOOR(APT. #2F,2R), REMOVED EX. OIL TANK AND GAS BOILER ON CELLAR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
This PL work filed associated with the interior renovation for new kitchen and bathroom fix, no change of use, egress or occupancy under this filing
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
REPLACE GAS TRAIN AND GAS CONNECTION TO REPLACEMENT GAS/OIL BURNER.
installation of outrigger for facade repair.
Renovation of existing garage: removal of the windows, new roof assembly over existing roof assembly, new roof deck, repair of exterior wall and/or replacement where necessary.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of new partitions, doors, ceilings and finishes on the 20th and 21st floors (TD Securities- 21st and 22nd Marketing Floors) as per plans. No change to use, egress or occupancy.
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
HEREBY FILING GENERAL CONSTRUCTION WORK AT 30TH FLOOR UNIT 30J AS PER PLANS.
Architectural modifications taking place on the 31st floor as per plans filed herewith. No change in use, egress or occupancy.
INTERIOR RENOVTION OF EXISTING 4 FAMILY HOUSE PER PLAN FILED. MODIFY NON-LOAD BEARING PARTITIONS. REPAIR FLOOR, WALL AND PAINTS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Non bearing partitions and finishes removal in suite 1001 on 10th fl. No change in use, egress or occupancy
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
PLUMBING MODIFICATIONS TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of approximately 32.87 linear feet of temporary 8-foot-high wood construction fence along the 7th Avenue frontage