PermitDig

Search Permits

245,623 results

Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

100 ERDMAN PLACE, Bronx
3KSep 30

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.

1115 FDR DRIVE, Manhattan
1KSep 30

CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

133-38 SPRINGFIELD BOULEVARD, Queens
8KSep 30

SUSPENDED SCAFFOLD APPLICATION FOR MATERIAL HOIST ONLY

675 HUDSON STREET, Manhattan
Sep 30

INSTALLATION OF PIPE SCAFFOLDING AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

235 EAST BROADWAY, Manhattan
10KSep 30

Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

1065 LEXINGTON AVENUE, Manhattan
0KSep 30

INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

37 SOUTH 3 STREET, Brooklyn
6KSep 30

Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

140 ERDMAN PLACE, Bronx
3KSep 30

INTERIOR FIRE AND WATER RESTORATION TO EXISTING TOTAL 2 FAMILY, NO CHANGE TO USE, OCCUPANCY, OR EGRESS, AND TO CURE EXISTING VIOLATIONS AS NOTED BELOW.

668 EAST 219 STREET, Bronx
70KSep 30

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

363 WEST 30 STREET, Manhattan
Sep 30

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

524 WEST 152 STREET, Manhattan
6KSep 30

PL FILING TO RESOLVE RCA, COMPLAINT #3A70370. at Cellar, Cap and remove 1-shower, 1-sink. and Legalize 1-water closet and 1-lavatory, existing slop sink to remain.

897 METROPOLITAN AVENUE, Brooklyn
10KSep 30

EXISTING 4 STORY MIX USED BUILDING WITH PLUMBING WORK AT CELLAR,BASEMENT,1ST,2ND AND 3RD FLOOR.JOB FILED TO RELATED TO ALT 2 APPLICATION#B01411450-I1.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.

294 SOUTH 5 STREET, Brooklyn
72KSep 30

INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.

117-13 169 STREET, Queens
78KSep 30

OFFICE RENOVATION WORK TO INCLUDE MECHANICAL MODFICATIONS AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

1 EAST 57 STREET, Manhattan
890KSep 30

PROPOSED INTERIOR RENOVATION ON CEL. PENTHOUSE & 1ST THRU. 3RD FLOOR. GENERAL CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.

983 52 STREET, Brooklyn
517KSep 30

INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

340 MORRIS AVENUE, Bronx
100KSep 30

General construction modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy

158 WEST 27 STREET, Manhattan
70KSep 30

Temporary structure for an event in the Ocean Life Banquet Hall. Removed at the end of the programing. No changes to existing structures, use or egress, or historical fabric.

200 CENTRAL PARK WEST, Manhattan
5KSep 30

INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

20-44 33 STREET, Queens
32KSep 30

Propose renovation of existing residential building with partition work and finish work as per plan. No change in use, egress, or occupancy.

1248 79 STREET, Brooklyn
360KSep 30

Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use, occupancy, or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with Chapter #33 of the 2022 Building Code.

200 EAST 64 STREET, Manhattan
8KSep 30

INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

385 CORTELYOU AVENUE, Staten Island
35KSep 30

RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

1456 79 STREET, Brooklyn
150KSep 30

Replace partitions on ground floor in retail store only. No change of Use, Egress, Occupancy proposed.

51 MERCER STREET, Manhattan
113KSep 30

APPLICATION FILED FOR REPLACEMENT OF EXISTING ROOFING MATERIALS ON EXISTING INSULATED BASE NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

89-35 155 AVENUE, Queens
60KSep 30

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

166 EAST 34 STREET, Manhattan
Sep 30

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

450 6 AVENUE, Manhattan
Sep 30

INSTALL TEMPORARY WOOD FENCE IN CONNECTION OF THE ALTERATION 1 APPLICATION JOB # B01371452-I1

1151 EAST 4 STREET, Brooklyn
9KSep 30

INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

2615 3 AVENUE, Bronx
95KSep 30