Search Permits
244,860 results
BENT TREE NORTH NO 3, BLK 23/8733, LOT 19
COYOTE MEADOWS PHASE 1B, BLK G, LOT 17
NORTHPOINTE CROSSING PHASE 3 EAST, BLK V, LOT 16
INSPIRATION PHASE 7A, BLK 14, LOT 17; (SEE R-11757-014-0170-W FOR MUD ONLY ACCT)
Installation of (2) electric vehicle charging stations at existing EdgeCore PH01 facility.
Commercial tenant improvement of 5,927 SF office space and includes existing restrooms. Group B occupancy and type III-B construction. Combining suites 201 - 205. Includes Mechanical and Electrical Improvements. Deferred Fire Sprinklers. Results in CofO.
New 4-plex Residential Row Homes for Hawes Crossing. Each two story townhouse has 1312 SF of living space, a 445 SF 2 car garage, a balcony and a porch. Each house has a water meter and a SES. Special inspections for post tension slabs. Fire sprinklers required.
Irrigation plans for Sunbelt Mesa Pond. Results in a CoC.
NEW 1970 SF SINGLE STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. ADDENDA MST22-18751 - PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION: · REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOU
CONSTRUCTION OF 330 SQ FT NON-LIVABLE ADDITION WITH A 90 SQ FT SHED (47 S.F. PREVIOUSLY APPROVED WITH PM SET PERMIT), ADDING 43 SQ FT TO EXISTING SHED. ALL UNDER EXISTING AWNING WITH CEILING JOISTS AND ELECTRIC. MINIMUM OF ONE 9-FT X 18-FT UNOBSTRUCTED PAVED, 2-IN ASPHALT OR 4-IN CONCRETE, PARKING SPACE REQUIRED BEHIND FRONT SETBACK. 56-FT X 44-FT INTERIOR CORNER LOT. MINIMUM SETBACKS ARE 3-FT FRONT MEASURED FROM EDGE OF ASPHALT, 3-FT REAR, 18-IN PM SIDE & 3-FT STREET SIDE. ACCESSORY STRUCTURE R
New ADU attached – 628 livable. Single story. 1 bedroom, living rm, kitchen, 1 bath, and laundry closet. Type V construction. R-5 occupancy. No change to existing ¾ inch water meter. New 100 amp sub panel from existing 200 amp electrical main. New electric to existing shed.
New 4-plex Residential Row Homes for Hawes Crossing. Each two story townhouse has 1312 SF of living space, a 445 SF 2 car garage, a balcony and a porch. Each house has a water meter and a SES. Special inspections for post tension slabs. Fire sprinklers required.
New non-load bearing partition walls inside existing suite to create new offices and ADA compliant restrooms. New mechanical RTU replacement like for like. New 1-hour rate storage room under interior stairs. New architectural and MEP. Group B Occupancy. Type V-B construction. 1,500 SF. Occupant Load 39. Results in CoO.
Permitting existing non-loadbearing wall enclosing dining area into flex room at proposed Community Residence. Reference: PMT25-23375, BOA26-00082, MST20-16271
New 4-plex Residential Row Homes for Hawes Crossing. Each two story townhouse has 1312 SF of living space, a 445 SF 2 car garage, a balcony and a porch. Each house has a water meter and a SES. Special inspections for post tension slabs. Fire sprinklers required.
NEW 2903 SF TWO STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. SEE MST23-16142 FOR STRUCTURAL CHANGES. ADDENDA MST25-01219 - SHEETS A2.1-A2.3 · REVISED SGD TO A 3050 SH WINDOW AT LEFT ELEVATION: PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION· REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F.
Residential bathroom remodel: To include demolition of existing tile shower, shower glass enclosure, plumbing trim, tile flooring, and partial ceiling block above shower. Install new Durabath low-profile shower pan (60" x 42"), Durabath Calcutta Azure smooth shower wall panels, corner shelves, ADA safety grab bars, Moen shower valve and fixtures, and clear glass shower enclosure with matte black hardware. Perform plumbing rough-in as required and install drain location per field conditions. Repa
NEW 2903 SF TWO STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. SEE MST23-16142 FOR STRUCTURAL CHANGES. ADDENDA MST25-01219 - SHEETS A2.1-A2.3 · REVISED SGD TO A 3050 SH WINDOW AT LEFT ELEVATION: PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION· REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F.
New 4-plex Residential Row Homes for Hawes Crossing. Each two story townhouse has 1312 SF of living space, a 445 SF 2 car garage, a balcony and a porch. Each house has a water meter and a SES. Special inspections for post tension slabs. Fire sprinklers required.
Install of new 600A Multi-meter Elec service and plumbing waste line extension request for 7225 SF, type VB construction, future M occupancy suite. Suite TI under separate permit. Results in CoC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, equipment cabinet, and 100A single phase pedestal electrical meter. New structural and electrical. Special inspections required: soils, post-installed anchors, cast-in-place foundation, and fabricated items. Approved as noted. Results in CoC
Replacing Backflow like for like
INSTALLATION OF ONE 120 LB PROPANE TANK W/ TWIN STAGE REGULATOR SURFACE MOUNTED TO WALL. CONNECTING TO EXISTING STUBOUT. GASLINE TO BE INSTALLED PER 2024 IFGC & FPD 6104.1.
Remodel 180 S.F. to frame in tandem garage making livable.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Demolish existing shower/tub and install 60" × 32" shower pan with 96 in-high wall surround, two chrome grab bars (18" & 24"), three corner shelves, window trim kit, and shower curtain rod. No sheathing/decking replacement specified. No structural change.
Installation of 30-ft of .75-in PE gas line buried 18-in with 18-gauge tracer wire from gas meter to 50K BTU fire pit. All gas lines are to be installed per 2024 IFGC & COM gas requirements. Contact COM gas engineering at 480-644-2909 to determine if the meter needs to be upgraded.
CONSTRUCT A 450 SF SWIMMING POOL NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST19-00383. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".