Search Permits
244,860 results
Two story townhouses with 2 car garages organized in groups of 4. Each house gets its own permit. New electrical service. See PMT22-09292 for the site work. See PMT23-12717 for individual water meters for each house
Tenant improvement of an existing building to create (2) suites. This 20,432 SF suite is for the church with new sanctuary, classrooms, restroom, kitchen with cookline. Group A-3 Occupancy and type V-B construction. With Mechanical, Plumbing and Electrical improvements. Includes a new gas meter and (2) electric service/meter panels. Deferred fire sprinklers, fire alarms, and hood suppression. Results in CofO.
PERMIT IS ONLY FOR THE INSTALLATION OF TWO STORZ POWER BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHE
New roof top CO2 system and glycol system with associated controls for refrigerated cases at existing mercantile building. Roof reinforcement at new RTUs. New structural, mechanical (including leak detection), and electrical. Special inspections required Steel Construction. Results in CoC.
TAYLOR MORRISON #4016 - NEW 1843 SF TWO STORY RESIDENCE WITH A 2 CAR GARAGE FOR HAWES CROSSING 6 . THE DESIGN HAS 3 ELEVATION OPTIONS WITH SLIGHTLY DIFFERENT AREAS. INCLUDES WATER, ELECTRIC AND GAS METERS. SPECIAL INSPECTIONS FOR POST TENSION SLABS, SEE MST23-15585 FOR PARCEL A, B AND D OF HAWES CROSSING. MST24-18584 ADDENDA - HAWES CROSSING PARCEL H - ADD PARCEL H STRUCTURAL INFORMATION. REFERENCE MST22-20982 & MST23-15585.
Primary Bathroom: Shower to shower – replace shower pan and fixtures at existing SFR -In the primary bathroom, remove existing fiberglass shower unit and replace with new shower system including low-profile shower pan, wall surrounds, shower fixtures, grab bar, corner shelves, and glass enclosure. Guest Bathroom: Tub to shower - In the guest bathroom, remove existing fiberglass tub/shower unit and convert to a walk-in shower with new low-profile shower pan, wall surrounds, shower fixtures, grab
Tenant improvement in existing 2,033 SF, type VB construction, B occupancy restaurant. Modification includes interior fit of vacant suite to include interior walls, doors ceilings to create Kitchen area with Type 1 Hood, walk-in cooler, serving area, dining area and (2) ADA restroom. Modification also include associated mechanical duct with existing RTU, exhaust fan, new MAU, associated plumbing and electrical lighting and power with (2) new panels. Special inspection req. Type 1 Hood Fire Duct
Installation of (3) three Illuminated multi-tenant monument signs installed near main drives along Signal Butte Rd. 12' height 74 sq. ft. each, (3) three Illuminated multi-tenant anchor signs one along Signal Butte Rd. one along Southern and one on the corner of Signal Butte and Southern 12' height 74 sq. ft. each, install (2) two illuminated property identification signs installed on the monument walls at the main entry off of Signal Butte Rd. MEDINA STATION 13 sq. ft. each and install non-illu
Tenant improvement of 2,868 SF, B occupancy office in existing 69,831 SF, type VB construction, S1 occupancy Warehouse suite. Modification only to create spec office area with (3) private offices, reception, breakroom, conference room and (2) restrooms for both office and warehouse withing existing shell. Improvements to include associated mechanical, electrical and plumbing work. No scope in warehouse. Deferred fire sprinklers. REF: PMT21-11731 Shell Bldg. Results in CoO.
COB25-00291 - Two repairs at this home have risen to the level to where they may need a permit. The first is a truss repair. 2nd is a window that is being moved from one location to another. Reference: MST20-17694
PERMIT IS ONLY FOR INSTALLATION OF TWO STORZ BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES
CONSTRUCT A 610 SF SWIMMING POOL NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Install two illuminated wall signs on front and rear elevations. VALVOLINE INSTANT OIL CHANGE 45.36 Sq ft. Install two illuminated wall signs on left and right elevations VALVOLINE INSTANT OIL CHANGE 31.63 Sq Ft each. Install one freestanding monument ground sign VALOLINE INSTANT OIL CHANGE 35.14 Sq Ft. Signs shall be installed per NEC 2023 with UL listed components
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install 1 Set of non illuminated reverse pan channel lettersets and logo mounted flush to the building fascia STRIPES PRIMARY CARE 22 sq. ft.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
Fabricate and Install LED Illuminated Pan Channel Lettersets and Logo on Front Elevation of Suite ANGRY COW 34 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
Manufacture and installation of one set of attached building sign illuminated return acrylic face letters. 13 sq ft LOGO BB SUITES. Signs shall be installed per NEC 2023 with UL listed components.
"Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.”
ELECTRIC TO NEW HEAT PUMP FOR EXISTING POOL. EFFECTIVE JANUARY 8, 2026, THE CITY OF MESA ADOPTED 2024 ICC AND 2023 NEC. AN APPROVED CODE MODIFICATION WAS ADDED TO THIS PERMIT ALLOWING CONTINUED COMPLIANCE WITH 2018 ICC AND 2017 NEC. STARTING APRIL 8, 2026, ALL NEW PERMITTED PROJECTS NOT SPECIFICALLY CONNECTED TO THIS PERMIT SHALL COMPLY WITH ADOPTED 2024 ICC AND 2023 NEC CODES. PLEASE VISIT MESA DEVELOPMENT SERVICES WEBSITE FOR INFORMATION ON THE ADOPTION PROCESS. HTTP://WWW.MESAAZ.GOV/BUSINE
Existing BBQ Kitchen & Patio Cover – After-the-Fact at existing SFR • Built-in BBQ grill • Hand washing sink • Mop sink • Gas line connection • Electrical outlets and lighting
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
CONSTRUCT A 42 SF SPA WITH EXISTING SWIMMING POOL NATURAL GAS HEAT. INSTALLATION OF 109-FT OF 1-1/2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2018 IFGC & COM GAS REQUIREMENTS.COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED OR NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MON
Installation of two illuminated wall signs face lit channel letters 130 sq ft each NO LIMIT TURF. One sign on south and west elevations. Signs shall be installed per NEC 2023 with UL listed components. Total sign area 260 sq ft.
Installation of one set illuminated pan channel letters and logo box on west elevation attached 50 sq ft. KC TURBOS. Signs shall be installed per NEC 2023 with UL listed components.
CONSTRUCT A 196 SF SWIMMING POOL & 49 SF SPA. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS". EFFECTIVE JANUARY 8, 202