PermitDig
svcIssued

Install two illuminated wall signs on front and rear elevations. VALVOLINE INSTANT OIL CHANGE 45.36 Sq ft. Install two illuminated wall signs on left and right elevations VALVOLINE INSTANT OIL CHANGE 31.63 Sq Ft each. Install one freestanding monument ground sign VALOLINE INSTANT OIL CHANGE 35.14 Sq Ft. Signs shall be installed per NEC 2023 with UL listed components

3663 S POWER RD, Mesa, AZ

Permit Details

Permit Number
PMT26-03221
Type
svc
Status
issued
Issued Date
April 15, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Arizona Sign and Lighting LLC

About svc Permits in AZ

0

svc permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES

7824 E JEROME AVE · PMT26-11463

New 10,780 SF, construction type V-B shell office and warehouse building for future Group B and S-1 occupancies, with 209 SF canopy. Scope includes the building shell, 4-hour fire separation on property line. MEP's, site improvements, canopy, and enclosed rear storage yard. New 600 AMP electric meter. New water 1.5-inch domestic and 1-inch irrigation meter. Deferred steel joists, fire alarm, fire sprinklers, and vehicular gate access. Special inspections required for soils, concrete, masonry, s

Unknown · PMT26-11786

Install (2) illuminated exterior building signs and (2) non-illuminated ground signs. Results in CofC.

8016 E PECOS RD · PMT26-11955

Create new additional parking spaces for an existing building in retention basin. Install new unground stormwater chambers at new parking area. ADM26-00284 special use permit for additional 15 parking stalls and addition of underground retention. Approved as noted. Results in CofC.

724 W UNIVERSITY DR · PMT26-10189

About svc Permits in Mesa, AZ

What is a svc permit?

A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.