Search Permits
243,291 results
8' HIGH SOLID FENCE AROUND PROPERTY PERIMETER.
Filing herewith for Structural Work as per plans.
ALT FILED TO ADDRESS BUILDING VIOLATIONS V 091326C26-02190, V 091326C26-02191. REMOVE PARTIAL VACATE ORDER. MAKE CONSTRUCTION REPAIRS AT 1ST & END FLOOR DUE TO VEHICLE ACCIDENT CONSTRUCTION SHALL BE AS SUCH TO MAINTAIN CONDITIONS PIRO TO DAMAGE
Interior finish work and new bathrooms work. New Storefront. Install type B category 1 kitchen exhaust vent to roof.
Suspended Scaffolding for Facade Restoration/Repair
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RENOVATION OF APARTMENT #4A. WORK INCLUDES NEW PARTITIONS AND FINISHES. PLUMBING WORK TO BE FILED AS SUBSEQUENT FILING. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Structural work in conjunction with DOB NOW#B01221316-I1
PLUMBING WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PROPOSED MECHANICAL WORK ON ROOF & 1ST FLOOR OF AN EXIST 1 STORYCOMMERCIAL BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
INTERIOR RENOVATION OF AN EXISTING 1 FAMILY HOUSE WORK ON 1ST FLOOR WITH , REPAIRING FLOOR, CEILING, NEW PARTITION, PAINTING , NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Connection of two new RTUs and disconnection of two existing unit heaters, subsequent to B01404794-I1
Suspended Scaffolding for Facade Restoration/Repair
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITH ALT1 JOB 321280742
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. NO CHANGES TO THE EXISTING MEANS OF EGRESS.
Interior demolition of plumbing systems per plans filed. No change in occupancy, use or egress.
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. NO CHANGES IN THE EGRESS.
Application filed for interior renovation and demolition work at floors 14,15 and 16
REPLACE PACKAGED AIR CONDITIONING UNIT ON 1-STORY ROOF AT NORTH WEST CORNER.
CONSTRUCT ONE FAMILY RESIDENCE WITH BUILT-IN ONE CAR GARAGE
CONSTRUCT ONE FAMILY RESIDENCE WITH BUILT-IN ONE CAR GARAGE
Conversion of the reail space to the day care center
Mechanical work on the 7th floor as indicated on drawings.
Sprinkler work for retail space for Intuit on 1st floor
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Application herewith filed for the plumbing work and its associated piping at apt.#4A on the 4th floor of a multi-family residence. No change to use, egress or occupancy.
SUSPENDED SCAFFOLD OUTRIGGERSYSTEM FOR EXTERIOR REPAIR.
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.