Search Permits
243,291 results
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
RENOVATION OF AN EXISTING DUNKIN' DONUTS STORE ON 1ST FLOOR OF AN EXISTING BUILDING. REPLACE EXISTING INTERIOR FINISHES AS NEEDED. INSTALL NON-LOAD BEARING KNEEWALLS. REMOVE AND INSTALL NEW MILLWORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION FOR ONE FAMILY DWELLING HOUSE. NO CHANGE IN USE OF EGRESS & OCCUPANCY
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Interior demo & reno of non-load bearing partitions, doors, walls, ceiling and finishes as indicated on plans,
PLUMBING WORK ON EXIST. RESIDENTIAL HOUSE WITH RELOCATE/NEW BATHROOM AND KITCHEN FIXTURES, BOILER AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION FOR ONE FAMILY DWELLING HOUSE. NO CHANGE IN USE OF EGRESS & OCCUPANCY
INSTALLATION OF PLUMBING FIXTURES FOR A NEW DETACHED TWO-FAMILY RESIDENCE.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
APPLICATION HEREWITH FILED FOR THE INSTALLATION OF A NEW ADA-COMPLIANT TWO-PIECE BATHROOM AND THREE (3) NEW POINT-OF-USE HOT WATER HEATERS ON THE FIRST FLOOR.
Modification of plumbing system at floors 14,15,16
Mechanical work for 14, 15, and 16th floors
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.
FILING FOR DEMOLITION OF EXISTING CHIMNEY STEEL STACK
GENERAL RENOVATION OF PROPOSED FOOD STORE WITH NEW PARTITION, FLOOR TILES,DOOR, REPLACE DROP CEILING TILES, STOREFRONT, PAINTING AND MECHANICAL WORK WITH INSTALL NEW EXHAUST SYSTEM AS NEED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modification of sprinkler system for the 14, 15, and 16th floors
INSTALLATION OF PLUMBING FIXTURES FOR A NEW DETACHED TWO-FAMILY RESIDENCE.
INSTALLATION OF NON-LOAD BEARING WALLS, FLOORS, CEILING & FINISHES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLD.
General construction modifications taking place on the 9 &10 construction/ 8th & 9th fl Marketing floor as per plans filed herewith. No change in use, egress or occupancy
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Construction work on the 7th floor as indicated on drawings.
GENERAL RENOVATION OF PROPOSED FOOD STORE WITH NEW PARTITION, FLOOR TILES,DOOR, REPLACE DROP CEILING TILES, STOREFRONT, PAINTING AND MECHANICAL WORK WITH INSTALL NEW EXHAUST SYSTEM AS NEED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION CELLAR FLOOR OF EXISTING 2 STORY RESIDENTIAL BUILDING. CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, STAIRS AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filing underground plumbing for new outdoor theater building erected on Damrosch Park at 61 Amsterdam Avenue (Block 1134, Tax Lot 10) as an enlargement of 140-146 West 65th Street (Block 1134, Tax Lot 1).
Minor partition work. Removal of one existing kitchenette, Installation of two new kitchenettes. Minor relocation of existing lighting fixtures. No change of use, egress or occupancy under this application.
Facade and garage repairs as well as privacy divider replacement as shown on the drawings filed herewith. No change in use, egress, or occupancy.
PLUMBING WORK OF EXISTING 2-FAMILY BUILDING AT CELLAR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.