PermitDig

Search Permits

243,291 results

Installation of 20-amp circuit breaker at Main Electric Panel for electric to pergola. Light gauge, pre-manufactured metal patio covers and awnings are exempt from building permit but not from zoning ordinance requirements. Maintain a minimum of 2-ft from overhang to the property lines to comply. Keep in mind if it is modified or changed from what the manufacturer's installation has approved it for then it will require a permit. Electrical to be installed per 2023 NEC requirements and SRP standa

10201 E TILLMAN AVE, Mesa
Oct 15

Add a second receptable for an additional washer/dryer unit

9754 E NAVARRO AVE, Mesa
Oct 15

New 2406 SF single story residence with a 2 car garage at AVALON CROSSING. Includes a new water, electric and gas meter. Includes an option of a tandem garage. See permit MST26-06635 for addenda - Code update 2024

10543 E UTOPIA AVE, Mesa
Oct 15

E01 - FACE REPLACEMENTS E02 - NON-ILL FLAT CUT OUTS E03 - NON-ILL DIRECTIONAL WALL PANEL E04 - NON-ILL FLAT CUT OUTS ON BACKER

35 N GUTHRIE ST, Mesa
Oct 15

E01 - FACE REPLACEMENTS E02 - NON-ILL FLAT CUT OUTS E03 - NON-ILL FLAT CUT OUTS ON BACKER

3945 E BROADWAY RD, Mesa
Oct 15

PLUMBING PERMIT TO REPLACE EXISITING WET SPACE WITH NEW SHOWER IN HALL/GUEST BATHROOM, INCLUDING NEW VALVE AND PREFABRICATED ARCYLIC WALLS. NO STRUCTRUAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.

7516 E HANNIBAL ST, Mesa
Oct 15

INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A CHARGEPOINT HOME FLEX HARDWIRED WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.

1303 W PECOS AVE, Mesa
Oct 15

CONSTRUCT A 488 SF SWIMMING POOL & 46 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 64-FT OF 1.5-IN PE GAS LINE BURIED 18-IN DEEP WITH 14 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS. COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED OR NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #

7339 E PLATA AVE, Mesa
Oct 15

PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.

2365 E CAMINO ST, Mesa
Oct 15

remove old score board and install new score board and ribbon displays

1235 N CENTER ST, Mesa
Oct 15

PLUMBING PERMIT TO REPLACE SHOWER LIKE-FOR-LIKE. REPLACING PAN, DRAIN, AND VALVES. USING GLASS DOOR. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.

3120 E RUSSELL ST, Mesa
Oct 15

PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

1515 N AARON, Mesa
Oct 15

exterior remodel scope to update finishes and interior remodel scope impact to front of store, offices, food service and portions of the sales floor

1525 S POWER RD, Mesa
Oct 15

Installation of a CO2 monitoring system for beverage dispensers.

1453 S SIGNAL BUTTE RD 101, Mesa
Oct 15

PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF

1625 E GREENWAY ST, Mesa
Oct 15

DEMO PRE-ACTION RISER AND ALL ASSOCIATED COMPONENTS. EXISTING PREACTION SYSTEM PIPING TO TIE BACK INTO EXISTING WET SYSTEM.

549 N STAPLEY DR, Mesa
Oct 15

Install access control and alarm system in new building.

221 W 6TH AVE, Mesa
Oct 15

This permit is for installation of the temporary protective fence only. No grading, plant removal, or construction shall begin until a separate construction permit is issued. Temporary protective fence is required to remain in place at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times.

8265 E KRAMER CIR, Mesa
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.Round 1 Tenant Space - Electrical permit for fire alarm permit 1170939

11160 VEIRS MILL RD, Silver Spring
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.Furnish labor and material to install devices on a pergola

8108 KERRY LN, Chevy Chase
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.Bathroom & porch

7201 46TH ST, Chevy Chase
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of one 6 ton AC+Gas rooftop packaged unit

13406 KINGSVIEW VILLAGE AVE, Germantown
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.PANEL REPLACEMENT 200 AMP 200 amps service replacement existing 200-amp service.

6201 NEWBURN DR, Bethesda
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF: # (2) SWITCHES # (6) OUTLETS # (2) LIGHTS AND # (1) CIRCUIT.

12328 PALERMO DR, Silver Spring
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and one outdoor camera.

3806 TREMAYNE TER, Silver Spring
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.8 smoke detectors

7717 ROCTON AVE, Chevy Chase
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.Electrical heavy up 200A

7717 ROCTON AVE, Chevy Chase
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.Install 9 rooftop solar panels 4.05kW.

9616 DILSTON RD, Silver Spring
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance. Running power to two agricultural out buildings and installing a few lights, plugs and switches in each structure.

20503 DARNESTOWN RD, Dickerson
Oct 15

Please do not request inspections under this permit until 2 business days after permit issuance.This project is to replace/upgrade the E3 Boards in the main FACP & the distributed audio cabinet cards (INI-VGE) on Ground Floor, 2nd, 5th & 8th Floors.

4800 MONTGOMERY LN, Bethesda
Oct 15