Search Permits
243,291 results
Installation of 20-amp circuit breaker at Main Electric Panel for electric to pergola. Light gauge, pre-manufactured metal patio covers and awnings are exempt from building permit but not from zoning ordinance requirements. Maintain a minimum of 2-ft from overhang to the property lines to comply. Keep in mind if it is modified or changed from what the manufacturer's installation has approved it for then it will require a permit. Electrical to be installed per 2023 NEC requirements and SRP standa
Add a second receptable for an additional washer/dryer unit
New 2406 SF single story residence with a 2 car garage at AVALON CROSSING. Includes a new water, electric and gas meter. Includes an option of a tandem garage. See permit MST26-06635 for addenda - Code update 2024
E01 - FACE REPLACEMENTS E02 - NON-ILL FLAT CUT OUTS E03 - NON-ILL DIRECTIONAL WALL PANEL E04 - NON-ILL FLAT CUT OUTS ON BACKER
E01 - FACE REPLACEMENTS E02 - NON-ILL FLAT CUT OUTS E03 - NON-ILL FLAT CUT OUTS ON BACKER
PLUMBING PERMIT TO REPLACE EXISITING WET SPACE WITH NEW SHOWER IN HALL/GUEST BATHROOM, INCLUDING NEW VALVE AND PREFABRICATED ARCYLIC WALLS. NO STRUCTRUAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A CHARGEPOINT HOME FLEX HARDWIRED WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
CONSTRUCT A 488 SF SWIMMING POOL & 46 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 64-FT OF 1.5-IN PE GAS LINE BURIED 18-IN DEEP WITH 14 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS. COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED OR NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
remove old score board and install new score board and ribbon displays
PLUMBING PERMIT TO REPLACE SHOWER LIKE-FOR-LIKE. REPLACING PAN, DRAIN, AND VALVES. USING GLASS DOOR. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
exterior remodel scope to update finishes and interior remodel scope impact to front of store, offices, food service and portions of the sales floor
Installation of a CO2 monitoring system for beverage dispensers.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
DEMO PRE-ACTION RISER AND ALL ASSOCIATED COMPONENTS. EXISTING PREACTION SYSTEM PIPING TO TIE BACK INTO EXISTING WET SYSTEM.
Install access control and alarm system in new building.
This permit is for installation of the temporary protective fence only. No grading, plant removal, or construction shall begin until a separate construction permit is issued. Temporary protective fence is required to remain in place at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times.
Please do not request inspections under this permit until 2 business days after permit issuance.Round 1 Tenant Space - Electrical permit for fire alarm permit 1170939
Please do not request inspections under this permit until 2 business days after permit issuance.Furnish labor and material to install devices on a pergola
Please do not request inspections under this permit until 2 business days after permit issuance.Bathroom & porch
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of one 6 ton AC+Gas rooftop packaged unit
Please do not request inspections under this permit until 2 business days after permit issuance.PANEL REPLACEMENT 200 AMP 200 amps service replacement existing 200-amp service.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF: # (2) SWITCHES # (6) OUTLETS # (2) LIGHTS AND # (1) CIRCUIT.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and one outdoor camera.
Please do not request inspections under this permit until 2 business days after permit issuance.8 smoke detectors
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical heavy up 200A
Please do not request inspections under this permit until 2 business days after permit issuance.Install 9 rooftop solar panels 4.05kW.
Please do not request inspections under this permit until 2 business days after permit issuance. Running power to two agricultural out buildings and installing a few lights, plugs and switches in each structure.
Please do not request inspections under this permit until 2 business days after permit issuance.This project is to replace/upgrade the E3 Boards in the main FACP & the distributed audio cabinet cards (INI-VGE) on Ground Floor, 2nd, 5th & 8th Floors.