Search Permits
243,291 results
New 2309 SF single story residence with a 2+ car garage at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs **SEE ADDENDA MST25-07605**
CONSTRUCTION OF 399 SQ FT LIVABLE ADDITION WITH A BATHROOM. A 120 SQ FT ATTACHED STORAGE ROOM WITH ELECTRIC AND PLUMBING FOR WASHER, DRYER, BATHROOM ON A RAISED FLOOR. CONSTRUCT A NEW 120 SQ FT UNCOVERED DECK IN FRONT OF ADDITION. MINIMUM OF ONE 9-FT X 18-FT UNOBSTRUCTED PAVED PARKING SPACE REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE. INTERIOR 34.641 X 63.508 LOT. MINIMUM SETBACKS ARE 4-FT FRONT, 5-FT REAR, 0-FT PM SIDE, 3-FT AWNING/CARPORT SIDE. ACCESSORY STRUCTURE ROOF AREAS
New Custom Home – Single-story custom home with 7,036 S.F. livable and 3,894 S.F. non-livable, including 5-car garage, two storage areas, covered porch, covered patios, and 280 S.F. detached ramada. Floor plan includes 4 bedrooms, 5 baths, great room, living room, kitchen, dining room, two offices, theater, and game rooms. Type V-B construction. R-5 occupancy. New 1? water meter, new sewer, and 400 amp electrical panel. Swimming pool and spa under separate permit. Deferred truss calcs. Special i
Tenant improvement of existing 140,025 SF, type VB construction, group F1 and B occupancy industrial facility for processing of electric motors, automotive components, and specialized in refining magnet concentrate materials. Modifications include new walls for locker rooms with showers and restrooms, maintenance area, (2) office areas, server room, new rated electric room, and sawcut of slabs at existing dock doors for new dock levelers and trenchwork for plumbing. Special inspection req. steel
New Development of a 1-story, 29,995 SF, type V-A construction, group R-2, A-2, A-3 and B non-separated occupancies, 85-bed dormitory with attached medical clinic. Medical clinic area includes (8) exam rooms, (2) wound care, nurse stations, lab, medical supply and Rx room. The Dormitory includes shared bathrooms, Day rooms, kitchen, cafeteria, offices, meeting rooms, utility rooms and storage spaces. Special inspection req. - steel, concrete, masonry, soils, fire-resistant penetration & joints,
Plumbing permit to replace existing wet space with new shower and tub including new valve and prefabricated acrylic walls in both master bathroom and hall bathroom. No structural changes. New installations will tie into existing piping. No change to overall square footage. Master bathroom shower remodel and hall bathroom tub remodel. No other work under this permit. All work to comply with 2024 IRC and 2023 NEC.
Install (1) 86.93 sq ft aluminum reverse channel letter with LED lighting GLENCORE BATTERY RECYCLING sign.
Tenant improvement in existing 4,557 SF, type VB construction, B occupancy suite for offices. Permit includes previous unpermitted construction of interior partitions and ceilings for (2) single user restroom on SE, (8) offices, (1) kitchenette area, and open office area and associated MEP to be permitted under this permit. New modifications include enlargement of (1) restroom for ADA compliance, new partitions to create additional office spaces and a foyer area. Deferred fire sprinklers. Appro
New 200 SF non-livable attached covered porch addition at the entry of the existing residence. Type V-B construction. No deferred items. No special inspections. Minimum required building inspections: Footing, strap/shear, framing and final. Ref temp fence permit PMT26-18745.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE FRANKLINWH BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDUL
Plumbing permit to convert tub to shower. Replace pan, drain, and valves in the master bathroom. No structural changes. New installations will tie into existing piping. Square footage will change from 2.67-ft x 6-ft. to 3-ft x 6.83-ft. No other work under this permit. All work to comply with 2024 IRC and 2023 NEC.
OTC Permit - connect 1 duct detector to shell FACP
Install four (4) dual EV chargers in parking lot of existing building. Existing electrical supply. Results in CofC.
Modify existing fire alarm system by installed a new fire alarm control panel, fire alarm radio/communicator, surge protection and (3) 12V batteries.
Repair existing foundation including installation of Steel Plates, reinforcing bars and helical piles for foundation stabilization. Special inspections required for helical piles and reinforcing installation. Minimum required building inspections: Footing, stem, and final.
Install two LED illuminated pan channel letter sets flush mounted to front and rear fascia of suite CHARLEE ROSE COFFEE - 27 SF each. Replace tenant panels in existing monument sign. Signs shall be installed per NEC 2023 with UL listed components.
Install exterior lift serving level 2 mezzanine at existing building. Install exterior door at second level top of lift. New electrical for lift and mini-split in MDF room. Special inspection required: welding. Approved as noted. Results in CofC.
EXPEDITE THREE STORY SLAB-ON-GRADE, WOOD FRAMED BUILDING WITH TPO MEMBRANE ROOF. AUTOMATIC SPRINKLER SYSTEM IS PROVIDED PER NFPA 13 STANDARDS. BUILDING IS USED FOR GUESTROOMS, REGISTRATION, LAUNDRY AND MECHANICAL AND ELECTRICAL ROOMS. STAIR ENCLOSURES ARE PROTECTED BY A TWO-HOUR RATED, INTERIOR REF: PMT26-15547 Site Improvements SEPARATION. ACCESSIBLE ROOMS ARE LOCATED ON THE FIRST THROUGH FOURTH FLOORS. THE ROOFING IS CLASS "B". Deferred fire sprinklers and fire alarm.
Fire Alarm - connection of duct smoke detectors to shell FACP for offiste reporting.
Remodel of existing 3,130 SF maintenance area. 1,330 to be partitioned off (non-structural) and used as accessory assembly conference room. 1,800 SF to remain maintenance area. Modify HVAC, plumbing, and electrical in both areas as required for new configuration. New ceiling and finishes in conference area. Deferred fire sprinklers, fire alarm, access control.
Installation of a sprinkler monitoring system with attic heat detection. Approved with Stipulation: Provide one Horn-Strobe in a normally occupied location to provide notification to occupants in accordance with M-IBC 903.3.1.2.3 …4.2. Provide a heat detection system throughout the attic that is arranged to activate the building fire alarm system.
Construction new building Chipotle restaurant at The Landing at Falcon Field 2,402 SF new construction, civil, architectural, structural.
New 126 SF detached non-livable pre-manufactured aluminum patio cover at rear of existing residence. Includes aluminum roof panels, support posts, beams, footings, anchors and associated electrical and gas work. Installation per Duralum manufacturer requirements and IAPMO UES ER-195. Type V-B construction. Minimum required building inspections: Electric rough in, gas rough in, electric final, gas pipe final and final.
Group A-3 occupancy. Type III-B construction. 4,183 SF. Occupant load 60. Existing suite. Demo partition walls and plumbing fixtures. New architectural and MEP. No exterior modifications. Approved as noted. Results in CofO
Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. THE ACT OF SELF DISCONNECTING UTILITY WIRES OR METERS IS PROHIBITED AND MAY CAUSE DAMAGE OR INJURIES. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility (either SRP at 602
Remodel existing carport to livable for the owner of the home. Enclose existing patio into two bedrooms to accommodate the 10-tenant maximum for the type of community home.
Repair existing residential stem wall using engineered helical pile foundation support system. Install helical piles per approved structural plans and manufacturer requirements. Contractor to provide installation depth and torque logs for each pile to engineer of record. Type V-B construction. Minimum required building inspections: Footing, stem and final.
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
build az room and deck
Applying for zoning approval for an Assisted Living Home