Search Permits
240,145 results
Construct alterations to existing one-family dwelling and detached accessory structure (garage) subject to field inspection (STFI).
Construct interior alterations to kitchen remodel for one family dwelling subject to field inspection STFI.
15/f unit #1508: in-kind bathroom remodel. new tile to replace (e) tile walls & floor. new shower and sink plumbing fixtures to replace (e). new lights to replace (e).
revision 202211307350 to correct details and remove language for deferred submittals
repair inside of garage area damaged wall. install new shelves for wifi network system. run power line for it.
remodel basement in single family home. add new bath & sauna. new glass doors & window.
side yard open aluminum fence. recorded survey of property , building fence within own property . intent was for a six foot fence but the kit was taller so seeking permit. fence no more tan 6'-4" tall above ground, light weight open fence.
install 2 new velux fcm curb mounted fixed skylights. new skylight openings 25.5x73.5 per plan
minor revision to pa# 2025-0428-5357 changing sub-panel location and door to closet.
suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includes demo and construction of non-structural partitions, doors, glazing, ceilings and finishes. mep deferred.
demolition of kitchen and bathroom, remodel kitchen and bathroom in kind. no change to floor layout and structual foot print. no wall stud demolition or configuration. will relocate vanity and toilet in bathroom.
remove and replace drywall and insulation like for like. remodel existing kitchen and 1 bathroom like for like. no relocation of walls
rev 202604280279: replace front windows and side windows. add new windows at rear per plans. 4 new skylights.
replace existing steel garage door, in kind. no rough opening changes. provide 200 sq.in. openings for ventilation at garage door.
horizontal and vertical addition to an existing single-family residence. new ground floor accessory dwelling unit per the state adu program.
to obtain final inspection for work approved under pa#201807194959. all work is complete.
45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491
administrative permit to document the legal use and occupancy of structure as a six story 70 unit plus comerical bldg. this determination is based on a review of records including sanborn map, assessor records and dbi site visit. no work under this permit.
garage door replacement and relocate door track to inside garage.
convert (e) 762 sq.ft. basement to living space. remodel kitchen of both units (walls to be removed). construct a 684 sq.ft. above (e) top floors.
to obtain final inspection for work approved under pa# 201112231235. all work is complete.
39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491
non structural, interoir remodel to e bathroom. demo existing bath and wal kin shower. existing wall per plans, demo existing vanity. close existing door entry and closet area. install new tub, new vanity, new walk in shower , new exhause fan, new light fixtures
to obtain final inspection for work approved under pa#202505216958 all work is complete
unit #21: demo stucco around windows at east and south elevation, windows replace perimeter of window, remove of reset windows, add new water proofing, new lath and stucco prime & paint (not visible from the st)
unit #22: demo stucco around windows at east and west elevation, perform framing repair around window, remove of reset windows, add new water proofing, new lath and stucco prime & paint
to renew pa# 200609253160 for final inspection. all work is complete.
remove and replace 4 windows, like for like; remove 1 window and replace with a slightly larger sized window; install a security door slightly different from the door that was approved by bldg 26-949.
10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491
shoring to hold up building. all work interior.