Search Permits
240,145 results
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
REPLACEMENT OF GAS BOILER. REINSTALL EXISTING BURNER.
INSTALLATION OF NEW AC UNITS AND DUCTWORK. NO CHANGE IN USE, EGRESS, USE OR OCCUPANCY.
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
Interior renovation of an existing doctor office as per the plans filed herewith. No change to the use, egress or occupancy.
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Filing to install the deli kitchen exhaust system, hood and ductwork as per plans.
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
INTERIOR, NON-STRUCTURAL DEMO OF EXISTING TWO-FAMILY DWELLING. NO CHANGE TO OCCUPANCY, USE, OR EGRESS UNDER THIS APPLICATION.
Construct alterations and additions for minor telecommunications antenna facility (TMobile) at the roof top to existing mixed-use building per plan.
Construct alterations to existing one family dwelling subject to field inspection (STFI).
Establish multifamily use (apartment) with ground-level commercial uses per land use code. Construct new mixed use building occupy per plan.
Construct new two-family dwelling (Units 1 & 2) per plan. (Establish use as [LAND USE DESCRIPTION] per land use code. Construct (2) new two-family dwellings per plan. Review and processing for two records under 7125875-CN).
Construct alterations to portions of a one-family dwelling subject-to-field inspection (STFI).
Demolish existing one-family dwelling subject to field inspection (STFI)
-Tear-off and dispose (1) one layer of existing materials & prep plywood deck for new roof.-Completely resheet the entire deck using 1/2" CDX plywood.-Install CertainTeed Integrity roofing system including all components and CertainTeed Landmark Pro shingles in Max Def Moiré Black.
Construct blanket permit tenant improvements to Consor Engineers on the third floor of existing commercial building per plan.
I am re roofing the upper roof and lower flanking roof only (Partial roof of building)
Construct alterations to install helical piers to stabilize existing one-family dwelling per plan.
Construct new one family dwelling (East Unit) per plan. (Establish use as housing for two attached dwelling units and one detached dwelling unit per land use code. Construct a two-family and one-family dwelling per plan. Review and processing for two records under 7124234-CN)
Tenant improvements to ground floor common spaces in existing apartment building occupy per plan.
Modifications to Deck and small section of eave to one dwelling subject to field inspection.
Construct minor alterations to telecommunications facility on existing tower per plan
Demolish existing one-family dwelling and accessory structures per plan.
Construct voluntary engineered seismic upgrade to basement of SFR STFI
Construct interior alterations to one family dwelling subject to field inspection STFI.
Replace two existing deck support posts with new concrete footings and new pressure-treated support posts subject to field inspection STFI.
Construct new two family dwelling (West Units) per plan. (Establish use as housing for two attached dwelling units and one detached dwelling unit per land use code. Construct a two-family and one-family dwelling per plan. Review and processing for two records under 7124234-CN)
Construct tenant improvement to portion of L - 12 office space in a commercial building per subject to field inspection STFI.
Demolish existing one family dwelling per plan