Search Permits
176,051 results
Remodel interior and exterior of exiting building.
ePlan: Residential Expedited Review - Three Unit - Bldg 1 New Construction of 2-Story SF Res [5bed 4bath] w/ attached garage
Change Out: Replace 40 and 47 gallon electric tank-type water heaters with 199K BTU natural gas tankless water heater
repairing service due to vandalism
Esparanza S426 C Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
New construction single-family residential 2-story 5 bedroom 4.5 bath with study flex room attached 2-car garage covered front porch and covered rear patio.
Express- Remove and replace roof with similar type material
Change of use to Medical office with PROJECT IS AN UPFIT OF AN EXISTING TENANT SPACE INVOLVING THE RECONFIGURATION OF THE EXISTING SPACE.
New Dumpster Enclosure
Replacement of an existing water heater Change out NG water heater like for like
Bldg.1 New construction of 2 story 3.5 bathrooms 5 bedroom SFR w/ covered front porch rear covered screened in patio and attached garage.
Replacement of complete existing central heat and air system with or without duct work Lesvia Millican: Replace 5-ton like-for-like electric system
Akins Early College High School - Minor interior renovations site fencing and a new portable classroom building 2025 000114 DA - Pending
Bldg #2 New 1-story dwelling unit container home 1 Bed/1 Bath
Installation of new Generac generator and service rated automatic transfer switch. Austin Energy Disconnect will be needed ( Thomas George)
Install 26KW standby generator + 200a transfer switch
Interior Alteration to approximately 4069 sq ft of existing office space.
Interior finish-out. SP-2022-0071C
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 2-STORY 4 BEDROOM WITH 3.5 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO
Express: Replace 8 windows (like for like)
For service on a rack with 200amp. Ref:2026-070827 EP
Replace one complete HVAC system serving Apt. 301 only: remove and replace one indoor fan coil and matching rooftop condensing unit. Reconnect existing refrigerant electrical and condensate. No ductwork involved.
7 DAY INTERIOR REMODEL OF EXISTING OFFICE SPCAE - OVA
ePlan: Commercial Expedited Review - Remodel Hospital - Level 2 - Sterilizer Equipment Replacement (430 SF).
New construction of 1 story sfr with 3 beds 2.5 baths attached garage
Replacement of complete existing central heat and air system with or without duct work Ricardo Perez: Replace 4-ton like-for-like system
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Harrison S356 D Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
New construction in-ground pool.
interior remodel - Home Remodel -Under house plumbing system replacement -new flooring for the house 1900 sqm -Wall and ceiling repair -replace 35x47 window with the same size and same location Kitchen Remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new AFCI outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles Master Bathroom Remodel -frame