Search Permits
247,466 results
WINDMORE PHASE 3, BLK G, LOT 9
WINDMORE PHASE 3, BLK G, LOT 11
MONTICELLO PARK PHASE 4, BLK F, LOT 20
WINDMORE PHASE 3, BLK G, LOT 12
renovation_(non-structural)
residential_re-roofing
renovation_(structural_or_non-structural)
Interior finish out [QT]
SERVICE UPGRADE TO A 200 AMP
Gas test meter release replace approx 3ft of black iron pipe
Construct new driveway approach of 11.65 FT. No sidewalk inspection per plan review.
HOME BUILDERS LOOP for New SFR COA BP: 2026-108030
BASE: Installing a backup battery system and additional meter socket.
ePlan: Residential Expedited Review - New Construction of 2-Story SF Res [5bed 4bath] with habitable attic and attached garage
Landscape and Irrigation
ePlan: Residential Expedited Review - New Autofill/Heated pool w/Spa
ETJ Installing a new irrigation system Ref: 2026-069970 W
BASE: Installing a backup battery system and additional meter socket.
Installation of a Generac 18kW w/ 150 AMP ATS
New 2-story single family residence 4 bedrooms/4.5 bathrooms with attached garage covered porch and covered patio
Install Level 2 EV Charger
BASE: Installing a backup battery system and additional meter socket
homebuilder loop ref. 2026-129194 BP
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Demo roof mechanical existing condensing unit and associated refrigerant piping. Prepare roof penetrations for new piping. Install new curbed outside air intake and install condensing unit. install new exhaust fan.
ePlan: Residential Expedited Review - New Duplex Unit A New construction of a 2-Story Single Family Res. [4bed 4.5bath]
TEMPORARY TPOLE FOR NEW CONSTRUCTION IN CASCADES AT ONION CREEK ref.2026-125176 BP
BASE: Installing a backup battery system and additional meter socket.
homebuilder loop ref. 2026-129210 BP