Search Permits
191,446 results
Alteration
Alteration
Plumbing Permits
Alteration
Alteration
HVAC
Alteration
HVAC
HVAC
Fire Protection Systems
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing. Deferred Hood Fire Suppression.
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 14-FT X 44-FT 2026 CAVCO ABOVE GROUND CHAMPION MH SET. SERIAL NO. 157-00P-H-A006894A, WITH A/C AT THE REAR. NO LP TANKS. GAS IS MASTER METERED. ONE 10-FT X 38-FT ATTACHED AWNING PER ICCESR1398. 64 S.F. SHED, NO ELECTRIC AND NO PLUMBING. NO OTHER ACCESSORY STRUCTURES UNDER THIS PERMIT. MINIMUM TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES REQUIRED ON 2-IN ASPHALT OR 4-IN CONCRETE BEHIND FRONT SETBACK WITH A MINIMUM OF ONE COVERED.
Foundation Stabilization with helical piers and polyfoam injection per engineered plans. Special Inspection Required for: Helical Pile Foundation.
Manufacture and install two sets of halo illuminated revers pan channel letters. West elevation 30 sq ft AUTO CARE WITH HEART and south elevation 24 sq ft LOGO OOROO. Replace acrylic faces on detached monument sign. Signs shall be installed per NEC 2023 with UL listed components.
Install two face lit channel letters/log building signs east elevation. One is a LOGO 25 sq ft and the other LOGO VERTICA FITNESS 51 sq ft. Signs shall be installed per NEC 2023 with UL listed components.
In an existing warehouse, install speculative offices including restrooms and conference rooms. Type V-B construction, Groups B & S-1 occupancies, 35,039 SF and equipped with fire sprinklers. Additionally, install roof top mechanical units. Deferred fire sprinklers. Results in CoO.
In an existing warehouse, install speculative offices including restrooms and conference rooms. Type V-B construction, Groups B & S-1 occupancies, 19,739 SF and equipped with fire sprinklers. Additionally, install roof top mechanical units. Deferred fire sprinklers. Results in CoO.
In an existing warehouse, install speculative offices including restrooms and conference rooms. Type V-B construction, Groups B & S-1 occupancies, 34,648 SF and equipped with fire sprinklers. Additionally, install roof top mechanical units. Deferred fire sprinklers. Results in CoO.
In an existing warehouse, install speculative offices including restrooms and conference rooms. Type V-B construction, Groups B & S-1 occupancies, 19,739 SF and equipped with fire sprinklers. Additionally, install roof top mechanical units. Deferred fire sprinklers. Results in CoO.
Residential Home-New 3,275 sq ft livable, 1,659 sq ft non-livable, single story.
The scope of this project is to install a 1,500 gallon vertical liquid oxygen tank on a new concrete equipment pad located outside. Additional equipment will include vaporizers, vaporizer auto switchover panel, pressure regulator panel and compressed oxygen backup cylinders. Screen walls, bollards and rod iron fence will be installed for protection of the system including a concrete drip pad.
Lofts @ Pioneer Crossing Homebuilding LLC master plan two-story triplex, R-5 occupancy, one- & two-facility dwelling. Plan1 livable at 1725 and nonlivable at 564, Plan2 livable at 1770 and nonlivable at 574, Plan3 livable at 2055 and nonlivable at 554. Water service 1 inch with 3/4 or 1-inch meter. 200 amp panel electric service. Deferred truss calcs. Fire sprinklers required: submit as an addenda. Special inspection for post tension, epoxy anchors, and soils grading and drainage. EV charger. R
New multi-tenant shell retail shop and associated site work. Type V-B construction with 11,264 SF tenant space and 2,635 SF of canopy. 2-hour rated wall separation from grocer building. Civil and landscape under PMT25-11661. (10) new electric meters, water meters under civil permit. Deferred fire sprinklers and fire alarm. Special inspection for structural items and electrical service 1000 amps or more. Results in a CoC.
AZ International Phase 3. On this phase, renovation of the facade and site development such as landscape, parking, and curbs where applicable. Deferred fire sprinklers and fire alarm. REF: other related permits status: PMT25-11905 - expired status since 5/6/26. Does not include gas meter - did not have sufficient info for gas meter (Provide gas ISO with pipe size, material, and developed length and btu demand. IFGC tb 402.4(5) PMT25-16671 - permit has not been issued and does not include gas m
180 SF remodel converting the existing covered patio to livable habitable space. Type V-B construction. No change to utilities. No special inspections. Minimum required building inspections: Footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear and final. If needed, underground plumbing.
Install a 6 post sail shade structure in a common area on the Cabana Mesa property. REF: PMT23-17445 Mesa offsite improvements + Landscape
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESU
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Remove an existing honeywell fire alarm system and install a new fire lite fire alarm system for the continued protection of the MGAA building.
Desert Uplands Envelope lot - All work related to swimming pool and spa is within the existing temporary fence. No new disturbance with this permit. The temporary fence is required to remain in place per the approved site plan at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times. Property line fencing is not permitted. A separate zoning inspection is required prior to final building inspection. Reference temporary fence permit P