Search Permits
204,597 results
Replace water service from meter to house
ePlan: Expedited Review - First Time Finish Out for Units.
*Addressing active code violation* Addition to existing 1-story single-family residential to include: 598 sqft rear addition to 1st floor; new covered patio; carport to garage conversion.
*SMART Housing* *Green Building* New 1-story 4 bedroom 2 bathroom single family residence with covered front porch and rear covered patio.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton AC System
- PUD 15 front setback 5 rear setback 5 side setback max impervious coverage is 60% max building coverage is 55% small-lot single family. PUD
ePlan: Expedited Review - First Time Finish Out for Units.
Interior Remodel to Existing Office/Warehouse. Work to include subdividing Existing Interior into Multiple Suites and New Overhead Doors at Warehouse (29365 SF) FYI- SDE is not correct size but an exception will be allowed. Must install a retro double door as todays standards show. See attached below. Per C. Purcell/R. Ruiz
CONSTRUCT NEW MULTIFAMILY COMPLEX BLDG 1 TYPE A
CONSTRUCT NEW MULTIFAMILY COMPLEX - CARPORT
irrigation for lawn
irrigation for lawn
ePlan: Expedited Review - First Time Finish Out for Units.
Construct new walkway of 3ft wide connecting from curb to residence and new driveway approach of 10 FT.
Replacement of complete existing central heat and air system with or without duct work UNT 121 BLD E LA CHENAY CONDOMINIUMS PLUS
*Green Building* New 1-story 3 bedroom 2 bathroom single family residence with attached garage covered front porch and rear covered patio. Revision 1: Revise house plan from an X35CN to T35AN. *Green Building* New 1-story 3 bedroom 2 bathroom single family residence with attached garage and covered front porch.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 3bath] with Attached Garage. Bldg 2
ePlan: Expedited Review - First Time Finish Out for Units.
ePlan: Expedited Review - First Time Finish Out for Units.
Replace an existing underground service with a new main breaker panel and meter can.
New construction of fuel station and exterior canopy structure at existing Grandview Hills Ancillary Buildings.
ePlan: Expedited Review - First Time Finish Out for Units.
Underground Service Upgrade To 350Amps
Replacement of an existing water heater Replace 50-gallon electric water heater Located in garage
Construct new driveway approach of 10 FT. No sidewalk inspection per plan review
NEW 1 STORY SINGLE-FAMILY RESIDENCE ATTACHED GARAGE COVERED PORCH AND PATIO
QT - REPLACE 5 WINDOWS LIKE FOR LIKE AT EXISTING COMMERCIAL RESIDENCE - OVA
Remodel and addition of an existing single family home ** Unit A EC & GC discussing service Location Front Left or Right Rear will be getting second permit if service to be on Unit B***(Spots)
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4.5bath] with Habitable Attic Attached Garage/Carport
Install new 17.00 KW rooftop solar system