Search Permits
204,597 results
ePlan: Expedited Review - First Time Finish Out for Units.
ePlan: Expedited Review - First Time Finish Out of Interior Amenity Space - contains Clubhouse Catering Kitchen Restrooms and Pool Equipment Room.
CONSTRUCT NEW MULTIFAMILY COMPLEX - CARPORT
Replacement of an existing water heater Replace 40-gallon Electric Water Heater Located in Hallway Closet UNT B BLD 5 LAS COLINAS AMENDED PLUS
Replacement of complete existing central heat and air system with or without duct work
20 feet of tunnel under home to repair sewer line
Replace water line from meter to house install backflow on irrigation and replace PRV
ePlan: Residential Expedited Review - Addition and Remodel to Existing Single Family Residential; Work to include 2-story addition to existing 1-story SF Res [4bed 2.5bath]
Replacement of complete existing central heat and air system with or without duct work
CONSTRUCT NEW MULTIFAMILY COMPLEX BLDG 2 TYPE: CLUBHOUSE
Building 1 Home: New construction of two-unit residential homes.
ePlan: Expedited Review - First Time Finish Out for Units.
CONSTRUCT NEW MULTIFAMILY COMPLEX - CARPORT
irrigation for lawn
Interior remodel to create dance studio. Building was originally constructed as a single unit and is being returned to a single unit.
ePlan: Expedited Review - First Time Finish Out for Units.
ePlan: Expedited Review - First Time Finish Out for Units.
secondary mechanical contractor for (reference building permit number 2026-025330 BP) only performing HVAC Piping
QT - South Shore Verison to install new fiber to existing rooftop cell equipment - OVA
ePlan: Expedited Review - First Time Finish Out for Units.
Garage conversion on unit B: convert existing garage to study living room 1 bedroom 1 bath with storage.
CONSTRUCT NEW MULTIFAMILY COMPLEX - TRASH ENCLOSURE
occupancy_permit_(c)
gas_test_permit_(r)
occupancy_permit_(r)
existing_bldg_-_remodel_only_(r)
re-roof_(r)
electrical_permit_(r)
re-roof_(r)
re-roof_(r)