Search Permits
204,597 results
Upon inspection of the sewer line three separate root intrusions were identified between the home and the city tap indicating multiple points of failure throughout the system. Given the overall condition of the line we recommend a full replacement of the sewer line from the home to the city connection approximately 40 feet in length to provide a long-term solution and prevent recurring issues. Our scope of work includes full excavation from the home to the city tap removal of the existing damag
Connect mobile home and add front deck 6x8 and rear deck 4x4
ePlan: Residential Expedited Review - New Autofill/Heated pool.
New 1-story single family residence covered porch and patio 2-car garage.
ePlan: Expedited Review - First Time Finish Out for Units.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 5 Ton AC System
New single-story SFR (4br/2ba) with attached garage covered patio and covered porch EV charger is not optional. It is required per IECC 2024.
New two-story single family residence with covered patio porch two-car garage.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res [4bed 4.5bath]. Covd patio over existing impervious cover.
Removal/reinstallation of existing solar system. AE. No changes being made.
PB- New Construction of 1 story single family residence 4 bedrooms 2 baths 2- car garage covered porch covered patio.
Replacement of an existing water heater Replace 50-gallon gas water heater Located in garage
Gas test to existing building due to meter being pulled for Bldg. 2 Suite B
Replacement of an existing water heater Navien 240A2 tankless gas water heater Located in in 2nd floor attic
ePlan: Expedited Review - First Time Finish Out for units.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work HVAC change out
ePlan: Expedited Review - First Time Finish Out for Units.
55 tunnel under home to replace pipe.
New construction of 2 story SSFR Condo with 3 beds 2.5 baths and attached 2 car garage PUD
Replacement of an existing water heater tankless water heater change out 510 El Paso St #B Austin TX 78704
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton vertical gas system
New construction of 1 story sfr attached garage covered porch and patio PUD
Total demo of SFR 1604 sq ft circa 1975 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
ePlan: Residential Expedited Review - TWO Unit - Unit 2 (3525 Stoneridge Dr) New construction of a 1-Story Single Family Res. [1bed 2bath] with outdoor kitchen
ePlan: Expedited Review - First Time Finish Out for Units.
Install new 7.29 kwdc rooftop solar system servicing new residential only. Bluebonnet
irrigation for lawn
New construction of a 2-story single family dwelling in a condo regime. 3 bedroom 2.5 bath with attached garage