Remove existing shingles. Replace planned 7 sheets of 1/2" CDX. Install Owens Corning Duration shingles.
We are removing the current composition shingles. We are then going to inspect the decking. If any decking is rotted we will replace with new 1/2" cdx but no replacement is planned at this time. We will then install a new underlayment and new composition shingles. This is a like for like install with no structural changes.
We are going to remove the current composition shingles. We will then install new 1/2" CDX over the current shiplap decking. We will then install new underlayment and new composition shingles. This is a like for like install with no structural changes.
Sorority house - full tear off existing of existing asphalt shingle roofing replace plywood decking with 1/2" CDX plywood install asphalt shingle roofing system
I would like to re sheath my roof replace some raters and put on new asphalt shingles.
1. Remove existing roofing consisting of 1 layer of composition shingles haul away and dispose.2. Set all fasteners and check for existing structure damage and repair if needed.3. Install 26-gauge 1x3 baked enamel starter metal around the roof to protect fascia and plywood under self-sealing starter strips.4. Install Ice and Water Shield around gutter edge W valleys and penetrations such plumbing pipe flashings and air vents.5. Put down CertainTeed Diamond Deck underlayment over the enti
Remove existing shingles. Replace planned (2) sheets of 1/2" CDX. Install Owens Corning Duration shingles.
Remove the existing single-ply roofing system and install a new mechanically attached 60-mil grey TPO roofing system. Replace up to seven (7) sheets of damaged roof sheathing as needed install a two-layer fire-retardant underlayment replace four (4) roof scuppers install new perimeter metal coping and flash all roof penetrations and details.
We are removing the current PVC roofing. We will be installing all new 1/2" cdx for a solid deck. We will then install new PVC material. This will be like for like with no structural changes.
We are removing the current composition shingles. We plan to add 1/2" cdx plywood over any existing shiplap. We will then install new underlayment. Then install new composition shingles. This is like for like install with no structural work.
House only - like for like replacement of composition roofing with some plywood replaced.
REMOVAL OF EXISTING COMP SHINGLES INSTALLATION OF LIKE KIND COMP SHINGLES. SHEATHING REPLACEMENT IS NOT ASSUMED BUT WILL BE REQUIRED IF ROT IS LOCATED DURING DEMO.
Residential reroof only; no structural changes. Remove existing shingles. No planned plywood replacement but if needed will use 1/2" CDX. Install Owens Corning Duration shingles.
WE are removing the current composition shingles down to the decking. We have no plans at this time to replace decking but will as needed. We will then install new underlayment and new composition shingles. Like for like replacement with no structural changes.
We are removing the current composition shingles down to the decking. We will replace decking as needed but no planned replacement at this time. We will then install new underlayment and new composition shingles. No structural changes.
We are removing the current composition shingles down to the decking. We will replace decking as needed but no planned replacement at this time. We will then install new underlayment and new composition shingles. No structural changes. We are doing both A&B units.
Residential reroof only; no structural changes. Remove existing shingles. Replace planned 5 sheets of 1/2" CDX. Install Owens Corning Oakridge shingles.
Reroof of Both Steep Slope and low slope areas:1. Steep Slope; remove and replace in like kind asphalt shingle roofing. Remove existing asphalt shingle roofing and dispose of properly. Install New Certainteed Landmark Asphalt shingle roofing system underlayment new edge metal and flashing all per manufacturer requirements for install. 2. Low Slope: remove and replace in like kind. Remove existing single ply roofing dispose of properly install new Carlisle 60mil TPO Single Ply membrane r
Reroof: Recover of existing asphalt bur roof roof with a Carlisle 60mil TPO single ply roofing system. Includes new edge metal and new flashings at penetrations all details per manufacturer recommendation's for install and for a 20 yr warrantable system.
We will be removing the current composition shingles. We have no plans to replace sheeting at this time but if needed we will replace with new 1/2" cdx plywood. We will then install new composition shingles. Like for like replacement.
We will be removing the current composition shingles. We will then plan to replace 3 sheets of the decking with new 1/2" cdx plywood. We will replace any sheeting if necessary. We will then install new composition shingles. Like for like replacement.
A roof replacement with new roof materials and updated venting.
TO REMOVE AND REPLACE 17 SQS SHINGLES AND 1 SQ OSB TO THE ROOF OF THE HOME.
Re-roofing Project
We will be removing the current composition shingles. We will then plan to replace 34 sheets of the decking with new 1/2" cdx plywood. We will replace any sheeting if necessary. We will then install new composition shingles. Like for like replacement.
Commercial re-roof. We will remove and dispose of existing roof down to structural deck. Install 2 layers of 3.3 ISO fully adhered per manufacturers specs. Single layer 1/2in HD ISO fully adhered per manufacturers specs. Single layer 60 MIL TPO Fully adhered per manufacturers specs. 20 year material and labor warranty.
Replace existing clay tile roof with standing seam metal roof
Residential reroof only; no structural changes. Remove existing shingles. Replace planned 3 sheets of 1/2" CDX. Install Owens Corning Duration shingles.
Installation of 50mil Single-Ply PVC membrane and 3/8" FanFold Insulation over (1) existing layer of granulated torch down. No revisions to existing sheathing structural or R-Value required.
? Load safety tools equipment and materials to perform the job correctly.? Perform Moisture scan to determine amount of wet insulation and roof board in the existing system. The moisture will be removed and replaced to match existing depth at time and material rates noted below.? Remove debris and existing flashings from the roof system in preparation for recover.? Install 60 mil TPO Fleeceback membrane over the existing system. Mechanically Attached.? Install 60 mil TPO membrane to cur