Search Permits
1,190 results · type: roofing
Remove existing shingles and install new plywood over shiplap. Install new architectural shingles.
2026 Re-roof St Anne Church
I would like to replace roofing and make necessary repairs.
Tear off current roof and replace with aluminum metal panels
Tear off roofing and reroof with torchdown
Overlay existing roofing system apply new PVC fleeceback membrane mechanically attached. Install new perimeter coping metal
Commercial roof recover. Existing torch-applied roofing to remain except localized damaged or blistered areas to be repaired as needed. Install R-Tech roofing underlayment over the prepared existing roof and install new PVC single-ply roofing membrane. No structural modifications. No roof deck replacement.
Residential reroof only; no structural changes. Remove existing shingles. Replace planned 2 sheets 1/2" CDX. Install Owens Corning Duration shingles.
Remove existing low-slope roofing system and replace with a new mechanically attached 60-mil PVC roofing system. Replace deteriorated roof sheathing as needed install new ridge ventilation tapered insulation for positive drainage gutters/downspouts and new perimeter flashing/drip edge. No change to building footprint.
We are removing the current composition roofing. We will inspect decking and replace any if necessary. 5 sheets are planned to be replaced with new 1/2" cdx plywood. We will then install new underlayment and new composition shingles. This is a like for like replacement with no structural changes.
We are removing the current composition shingles. We will install new underlayment and new composition shingles. We will inspect and change any decking that is rotted with new 1/2" cdx plywood. This is for a like for like install with no structural changes.
We are performing a single-ply membrane overlay onto the existing BUR on wood deck. The membrane will be in-seam fastened over a geotextile fabric separation layer per manufacturer warranty requirements
1. Removal of Existing Roofing System Carefully tear off one layer of existing roofing material across the entire roof surface. Remove all associated debris nails and damaged materials. Perform a full cleanup of the property at the end of each workday to maintain a safe and tidy jobsite.2. Installation of Underlayment & Weather Protection Install Epistik plus peel and stick high-temp underlayment engineered to provide superior moisture resistance and secondary weather protection be
-Tear-off and dispose (1) one layer of existing materials & prep plywood deck for new roof.-Completely resheet the entire deck using 1/2" CDX plywood.-Install CertainTeed Integrity roofing system including all components and CertainTeed Landmark Pro shingles in Max Def Moiré Black.
I am re roofing the upper roof and lower flanking roof only (Partial roof of building)
Removing and replacing roof on low slope section of roof.
Like for like light-weight re-roof partial replacement of sheathing with 1/2" CDX plywood
Residential reroof only; no structural changes. Includes pitched roof only. Flat roof and detached garage not included. Remove existing shingles. Install all new 1/2" OSB decking. Install IKO Cambridge shingles.
Tear off existing 1 layer of TPO roofing down to roof deck Inspect roof deck for dry rot Installation of 2 layers of 2.6'' polyiso mechanically attached (to bring the roof up to code) Installation of 1/2'' HD Coverboard mechanically attached for fire rating Installation of crickets around drains to allow the water to properly drain Installation of 60 mil Mule Hide TPO mechanically attached Current parapet cap flashings will be removed and reinstalled - does not include new me
-Tear-off and dispose (1) one layer of existing materials & prep plywood deck for new roof.-Completely resheet the entire deck with 1/2" CDX plywood.-Install CertainTeed Integrity roofing system including all components and CertainTeed Landmark Pro shingles in Cinder Black.-Install new seamless aluminum 5" K-style gutters and 2" x 3" downspouts in LG White.
-Tear-off and dispose (1) one layer of existing materials & prep plywood deck for new roof.-Completely resheet the entire deck using 1/2" CDX plywood.-Install GAF EverGuard 60-mil. TPO membrane including all components.
Remove existing shingles and install new.
ReRoof 499782 - Remove approx 22 SQ of wood shake roofing and replace with asphalt shingles. Install all new plywood over top of ship lap decking.
Reroofing 730 sqft of roof above the west entrance along 5th ave
Re-roof of multiple roof faucets. Remove existing and install vapor retarder over concrete deck average R-30 adhered roof insulation with 0.25/12 taper self-adhering base sheet torch down cap sheet.
We are removing the current composition shingles. We will replace decking as necessary with new 1/2" cdx however no replacement is planned at this time. We will install new underlayment and then new composition shingles. This is a like for like replacement with no structural changes.
Residential reroof only; no structural changes. Remove existing shingles. Replace 2 sheets planned plywood 1/2" CDX. Install Owens Corning Duration shingles.
We are going to remove the current composition shingles. We will replace any decking if necessary with new 1/2" CDX plywood. We will then install new underlayment and new composition shingles. This is a like for like install with no structural changes.
PVC Roof Overlay
Roof overlay. Install new cover board and then new 60 mil reinforced EPDM over the existing membrane.