Search Permits
2,919 results · type: commercial
Install (2) new shade structures (1,055 SF) over playground equipment at an existing City of Mesa park. Related site work being completed by separate permits (PMT26-05271 and PMT26-15034). Results in CofC.
Replace old 4 stack meter with a new 5 stack meter
Modifying rooms 108 and 109 in Building 580 to support the installation of new 5 axis core carver and NDT CT scanner.
INSTALLATION OF BACK UP GENERATOR AUTOMATIC TRANSFER SWITCH GAS LINE FOR GENERATOR
ANNUAL FACILITIES PERMIT FOR YEAR 2026 FOR M1
Remodel of existing 3,130 SF maintenance area. 1,330 to be partitioned off (non-structural) and used as accessory assembly conference room. 1,800 SF to remain maintenance area. Modify HVAC, plumbing, and electrical in both areas as required for new configuration. New ceiling and finishes in conference area.
This record ID is to track the letter agreement to establish in lieu payments from Bridgestone from December 3, 2012 development agreement that weren't paid BATO and the City agree that BATO will make an in-lieu payment to the City in the amount of $1,174,366.00 ("In-Lieu Payment") As a modification to the requirement in Section l .5(c) of the Development Agreement that requires payment within ninety (90) days of the City Engineer's approval of the cost estimate, the City agrees to allow BAT
Installation of solar photovoltaic energy generation system on fuel island canopy(ies), including trenching to back exterior wall of store for feeder conductors to utility line side interconnection
Destination at Gateway - Berge - Mountain Rd. Two new single phase electric meters. (6201 S. Mountain Rd TS, 6210 S. Mountain Rd TP1). New 3/4-inch LS water meter.
Type V-B construction. Group A-3 occupancy. 8,262 SF. Occupant load 466. New inground commercial pool and spa at new apartment complex. New associated circulation equipment. New pool barrier and gates. Associated permits PMT25-05979 (Building 4 - Clubhouse) and PMT25-16285 (Building 5 - Fitness Center). Special inspections required: concrete construction. Approved as noted. Results in CofO.
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. New structural and electrical. Results in CofC.
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
This report identifies permits and documentation required to obtain a permit for removal or restoration of the building to a safe condition. This report is not an appraisal for financial claims. The building inspector may require portions of the building or other debris to be removed to allow evaluation of the damage. Structural shoring and additional lighting may also be required. Before demolition or restoration can begin, an approved method of trash containment and removal must be in place. D
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
Case Study request to assess egress compliance proposition per the attached letter.
*THE PARCEL INFORMATION IS INCORRECT AND DOES NOT REFLECT THE RECENT LOT SPLIT, OWNERSHIP & ADDRESS - PLEASE SEE THE UPLOADED DOCUMENT TITLED "LotSplit-3215NHigley"* Improvements include a lift station at the northeast corner of Higley Rd. and E. Longbow Pkwy., sanitary sewer lines and appurtenances in E. Longbow Pkwy. and abandoning of existing sanitary sewer lines and appurtenances along the north boundary of the Longbow Golf Club.
Development of 229,416 SF, Type II-B construction, groups B and S-1 occupancy single story data center. The development building is designed with tilt wall construction. The building will have supported chiller cooling platforms on south and north side of the buildings. Special Inspections Req - Emergency Responder Radio Coverage IFC 510. Special inspection required - Fire -Resistance Penetration and Joints, concrete, steel, masonry, anchors & bolts, soils, hi-pot testing. Deferred - stairs & pl
construction commercial pool and spa
Construct 2,400 LF drainage channel along the northside of Baseline Road starting 1,000 feet east of Signal Butte Road to Springwood Blvd. Improvements also include concrete wall construction, new fencing, rip-rap installation, and all weather access path.
Tenant improvement at existing type IIB construction B occupancy Credit Union bank. Modification is site work only to include removal of pneumatic tubing system and install of drive up kiosk with associated elect at existing drive thru and canopy. Results in CoC.
Install self-contained hood and fryer system with Ansul Fire Suppression System consisting of one 3-gallon tank supporting (11) flow points.
ADOT enhancement landscape improvement plans. No new Landscape Meters. Landscape meter installed under onsite Grove at Lehi permit. No ROW permits issued since all work is within ADOT right-of-way
Development of single-story 81202 SF shell building. Type II-B construction and Group S-1 occupancy. Includes (1) 4000A Electric Service and (1) gas meter. Deferred fire sprinklers. Deferred fire alarms. Special Inspections Required for: Inspection of Fabricators, Steel Construction, Concrete Construction and Soils. Special Inspections for Emergency Responder Radio Coverage. Results in CofO.
CONCEPT COMMERCIAL CONSTRUCTION, A GENERAL CONTRACTOR FIRM, IS PROPOSING TO BUILD A NEW 21,486 SQUARE FEET GROUND-UP BUILDING ON TWO EXISTING SITES LOCATED AT 6940 (N5) AND 6954 (N6) E. VIA NORTHGATE. THE SITE IS CURRENTLY VACANT WITH EXISTING DRIVES AND OFFSITE IMPROVEMENTS ARE IN PLACE. CONCEPT COMMERCIAL IS PROPOSING A NEW GROUND-UP BUILDING FOR THEIR OFFICE AND WAREHOUSE ON N6 AS WELL AS A SPEC. OFFICE/WAREHOUSE IN THE OTHER PORTION OF THE SITE ON N5. THE PROPOSED BUILDINGS CONSTRUCTION WILL
Create new additional parking spaces for an existing building in retention basin. Install new unground stormwater chambers at new parking area. ADM26-00284 special use permit for additional 15 parking stalls and addition of underground retention. Approved as noted. Results in CofC.
Replacement of (40) RTUs on an existing 223,631 SF, construction type V-B Walmart. Scope includes structural modifications required and update to associated electrical. Special inspection for steel. Approved as noted. Any modifications to the fire protection systems will require a separate submittal. 2018 IFC 901.2. Results in CoC.
Replace existing 5 meter combo with New Meter combo listed on the SRP Pre approved charts
Remove existing sand (3,321 SF) and sidewalk 80 (SF) at an existing City of Mesa park. New ADA ramp, french drain, sidewalk, park benches, steel fencing, and playground surfaces. New light pole and electrical provided for light at future canopy. Existing electrical meter and panel 100A. Playground equipment and canopy to be installed under separate permits. Results in CoC.