REMODEL GARAGE TO SALES OFFICE FOR A MODEL HOME COMPLEX. ALL WORK SHALL COMPLY WITH 2024 IBC, 2024 IRC, 2023 NEC, 2017 ADA A117.1. THIS HOME IS NOT TO BE INHABITED UNTIL THE SALES OFFICE IS CONVERTED BACK TO A GARAGE. GARAGE AREAS MODIFIED OR IMPROVED FOR THE PURPOSE OF PROVIDING A TEMPORARY OFFICE SHALL BE RESTORED BACK TO A GARAGE PER PARKING STANDARDS IN CHAPTER 32 OF ZONING ORDINANCE PRIOR TO THE SALE OR RESIDENTIAL OCCUPANCY OF SUCH MODEL HOME. SECURITY STANDARDS TO BE MET PER SEC R328. T
3654 E SIERRA MORENA ST, Mesa, AZ
Permit Details
- Permit Number
- PMT26-17730
- Type
- other_commercial
- Status
- issued
- Issued Date
- October 27, 2026
- County
- Mesa, AZ
Parties
- Contractor
- RESERVE 100 LLC
About other_commercial Permits in AZ
0
other_commercial permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
7824 E JEROME AVE · PMT26-11463
New 10,780 SF, construction type V-B shell office and warehouse building for future Group B and S-1 occupancies, with 209 SF canopy. Scope includes the building shell, 4-hour fire separation on property line. MEP's, site improvements, canopy, and enclosed rear storage yard. New 600 AMP electric meter. New water 1.5-inch domestic and 1-inch irrigation meter. Deferred steel joists, fire alarm, fire sprinklers, and vehicular gate access. Special inspections required for soils, concrete, masonry, s
Unknown · PMT26-11786
Install (2) illuminated exterior building signs and (2) non-illuminated ground signs. Results in CofC.
8016 E PECOS RD · PMT26-11955
Create new additional parking spaces for an existing building in retention basin. Install new unground stormwater chambers at new parking area. ADM26-00284 special use permit for additional 15 parking stalls and addition of underground retention. Approved as noted. Results in CofC.
724 W UNIVERSITY DR · PMT26-10189
Similar other_commercial Permits
This is for the facade improvements for (2) new framed gabled entry features. This includes limited landscape, structural and electrical. No interior work. Special inspection for post-installed anchors, concrete, masonry. Deferred fire sprinklers. Results in CoC.
Mesa, AZ · PMT26-04685
Install new 200 amp overhead service to replace existing 200 amp overhead service, like for like, per SRP design, at Clubhouse location. No additional load added. Old pole is rottiing out.
Mesa, AZ · PMT26-18111
Install an Analox AX 60+ CO2 detection system. CO2 tank is existing. Reviewed as noted.
Mesa, AZ · PMT26-18499
Installation of high pile combustible storage racking. Special inspection for post installed anchoring. Results in CoC.
Mesa, AZ · PMT26-18585
Replacement of 3/4" backflow Assembly located in the pool pump room INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
Mesa, AZ · PMT26-19120
About other_commercial Permits in Mesa, AZ
What is a other_commercial permit?
A other_commercial permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.