Electrical
326 A ST, Boston, MA 02210
$2,000
Estimated Value
Permit Details
- Permit Number
- E1694493
- Type
- Electrical
- Status
- closed
- Issued Date
- March 6, 2025
- Expires
- September 5, 2025
- County
- Boston, MA
Parties
No contractor listed
About Electrical Permits in MA
3,562
Electrical permits in MA
$97,755
Average estimated value
Other Permits in Boston, MA
Similar Electrical Permits
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A NEMA 14-50 OUTLET IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Mesa, AZ · PMT26-15126
Installation of 22kw generator, sub panel, transfer switch, and dedicated gas line to existing SFR. Minimum required building inspections: Electric rough in and electric final, Gas rough in and gas pipe final, and final.
Mesa, AZ · PMT26-16748
Upgrade existing electrical panel to 400 amp service. No other utility changes. No deferred items. No special inspections. Minimum required building inspections: Electric rough in and electric final.
Mesa, AZ · PMT26-05551
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Mesa, AZ · PMT26-18318
Add a 90a breaker to existing main panel, install a 125a sub panel on the opposite outside wall of the house, run aluminum #2 2-2-2-4 SER Cable through the attic to it, and install a 50a and 20a plug to breakers in the sub panel
Mesa, AZ · PMT26-18718
About Electrical Permits in Boston, MA
What is a Electrical permit?
A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
This permit expires on September 5, 2025.
Where does this data come from?
This permit record comes from Boston, MA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.