Search Permits
2,722 results · type: residential
This report identifies permits and documentation required to obtain a permit for removal or restoration of the building to a safe condition. This report is not an appraisal for financial claims. The building inspector may require portions of the building or other debris to be removed to allow evaluation of the damage. Structural shoring and additional lighting may also be required. Before demolition or restoration can begin, an approved method of trash containment and removal must be in place. D
BLDG 6 Construction of (1) new Type C building. Type V-B construction. Each building is 476 SF with a 105 SF patio. The building includes (1) one-bedroom dwelling unit, complete interior and exterior construction, and associated building systems. Deferred submittal for engineered I-joist design. Special inspections required for soils, concrete, masonry, wood, post-tensioned concrete, post-installed anchors, fire-rated assemblies, and spray foam insulation. Reviewed as noted. Results in CoO.
Installation of 4 backup batteries.
Roof mount PV 10 panels 4.100 kwdc with ess
45 new townhouse rental structures consisting of 3B2.5B and one 3B2B ANSI A units with required sitework and parking. This submission also includes PUFE dedications and lot combination documentation. Deferred fire sprinklers, fire alarm, truss calculations, and vehicle access gate. All off-site improvements and street frontage landscaping must be installed in the first phase of construction. (4) 2" Domestic Water Meters and (1) 1" Landscape Water Meter included in this permit.
Building 9: 3-story, type V-A construction, 77,927 SF, group R-2 occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit
New detached garage structures consisting of (4) G10 garage buildings and (2) G9HC garage buildings. G10 buildings are Type V-B construction, Group S-2 occupancy, totaling 2,404 SF each. G9HC buildings are Type V-B construction, Group S-2 occupancy, totaling 2,271 SF each. Scope includes architectural, structural, and electrical systems. Deferred fire sprinkler system and truss calculations. Separate permit to be submitted for sprinkler monitoring. Special inspections required for soils, concret
New Building of 276-units multi-family development comprising of (9) 3-stories multifamily buildings. BLDG 8: New 3-story, type V-A construction, 46,623 SF, group R-2, 36 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, fire alarm and electric vehicle gates. Water meters: (1) 2-inch Domestic. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. Re
New Building of 276-units multi-family development comprising of (9) 3-stories multifamily buildings. BLDG 7: New 3-story, type V-A construction, 46,623 SF, group R-2, 36 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, fire alarm and electric vehicle gates. Water meters: (1) 2-inch Domestic. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. Re
New Building of 276-units multi-family development comprising of (9) 3-stories multifamily buildings. BLDG 6: New 3-story, type V-A construction, 46,623 SF, group R-2, 36 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, fire alarm and electric vehicle gates. Water meters: (1) 2-inch Domestic. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. Re
New Building of 276-units multi-family development comprising of (9) 3-stories multifamily buildings. BLDG 10: New 3-story, type V-A construction, 46,623 SF, group R-2, 36 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, fire alarm and electric vehicle gates. Water meters: (1) 2-inch Domestic. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. R
New Building of 276-units multi-family development comprising of (9) 3-stories multifamily buildings. BLDG 9: New 3-story, type V-A construction, 46,623 SF, group R-2, 36 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, fire alarm and electric vehicle gates. Water meters: (1) 2-inch Domestic. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. Re
BLDG 4: New 3-story, type V-A construction, 31,104 SF, group R-2, 24 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, and fire alarm. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. Results in CoO.
New 2,887 SF Type V-B clubhouse building with a 225 SF covered entrance and 672 SF covered porch. Scope includes leasing office, reception, coffee lounge, business center, restrooms, MEP systems, and finishes. New 400 AMP electric meter. Deferred submittals include fire sprinklers, fire alarm, access control, and truss calculations. Special inspections required for soils and concrete. Results in a CoO.
BLDG 3: New 3-story, type V-A construction, 31,104 SF, group R-2, 24 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, and fire alarm. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. Results in CoO.
New 1,842 SF. Construction type V-B. Group B Fitness Center. Scope includes exercise rooms, lobby, pet spa, janitor room, restrooms, MEP systems, and interior finishes. Special inspections required for soils, concrete, masonry, and post-installed anchors. Deferred submittals include fire sprinklers, fire alarm, and truss calculations. Reviewed as noted. Results in CoO.
BLDG 5: New 3-story, type V-A construction, 15,585 SF, group R-2, 12 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, fire alarm. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. Results in CoO.
New Building of 276-units multi-family development comprising of (9) 3-stories multifamily buildings. BLDG 2: New 3-story, type V-A construction, 46,623 SF, group R-2, 36 unit Multifamily building. Special inspection req. - concrete, soils, Fire-resistant penetration & joints. Deferred submittal: Roof trusses. Deferred 13R fire sprinklers, fire alarm and electric vehicle gates. Water meters: (1) 2-inch Domestic. REF: PMT25-21560 for civil improvement and water meters. Approved with comments. Re
This project consists of new development of 305-units multi-family development comprising of (1) 4-stories multifamily building, (2) 3-stories multifamily buildings and (1) 1-story detached garage/maintenance building. BLDG 1: New 4-story, 281 units, 310,401 SF, type V-A construction, group R-2 and S-2 primary occupancies and group A-3 and B accessory occupancies multifamily building with 3,241 SF of type V-B group S-2 occupancy detach garage and maintenance bldg, 2,675 SF of canopy and site ra
2-story, type V-A construction, 22,150 SF, group R-2 and M occupancy, 12 unit Mixed use building. Special inspection required for steel, concrete, masonry, wood, anchors, Fire-resistant Penetrations & Joints. Deferred submittal: Floor and Roof trusses, storefront, stair guardrails and handrails. Deferred fire sprinklers and fire alarm. REF: PMT24-16677 for primary permit. Water meters: (1) 2-inch Domestic. Results in CoO for Residential only. Retail shell only.
2-story, type V-A construction, 18,873 SF, group R-2 occupancy, 19 unit Live/Work building. Special inspection required for steel, concrete, masonry, wood, anchors, Fire-resistant Penetrations & Joints. Deferred submittal: Floor and Roof trusses, storefront, stair guardrails and handrails. Deferred fire sprinklers and fire alarm. REF: PMT24-16677 for primary permit. Water meters: (1) 1.5-inch Domestic. Results in CoO.
New 4-story, type V-A construction, 90,516 SF, Groups R-2, M and S-1 occupancies, 84-unit multi-family building with ground floor retail. Special inspections: steel, concrete, masonry, wood, anchors, fire-resistant penetrations & joints, and 1,000 amp electrical equipment. Deferred submittal: floor and roof trusses, steel stair, guardrails and handrails, fire sprinklers, fire alarms, and access control. Water meters: (1) 2-inch Domestic. Ref: PMT24-16677 for Phase I. Ref: PMT25-21729 for Phase I
New 4-story, type V-A construction, 93,270 SF, Groups R-2 and S-1 occupancies, 88-unit multi-family building. Special inspections: steel, concrete, masonry, wood, anchors, fire-resistant penetrations & joints, and 1,000 amp electrical equipment. Deferred submittal: floor and roof trusses, steel stair, guardrails and handrails, fire sprinklers, fire alarms, and access control. Water meters: (1) 2-inch Domestic. Ref: PMT24-16677 for Phase I. Ref: PMT25-21729 for Phase II commercial building. Ref:
New 900 SF Type V-B mail kiosk and maintenance building. Scope includes a required 1-hour fire-resistance-rated east exterior wall for separation from Building 2, electrical systems, and interior and exterior finishes. Deferred truss calculations and fire sprinkler system. No new meters. Fire sprinkler monitoring shall be submitted under a separate related permit. Special inspections required for soils, concrete, and fire-resistance-rated assemblies. Results in a CoO.
BLDG 10 UNIT 116 & 117 Construction of (6) new Duplex Type B buildings, Type V-B construction. Each building is 952 SF with a 209 SF patio. Each building includes two (2) one-bedroom dwelling units separated by required 1-hour fire-rated partitions, complete interior and exterior construction, and associated building systems. Deferred submittal for engineered I-joist design. Special inspections required for soils, concrete, masonry, wood, post-tensioned concrete, post-installed anchors, fire-rat
BLDG 8 UNIT 112 & 113 Construction of (6) new Duplex Type B buildings, Type V-B construction. Each building is 952 SF with a 209 SF patio. Each building includes two (2) one-bedroom dwelling units separated by required 1-hour fire-rated partitions, complete interior and exterior construction, and associated building systems. Deferred submittal for engineered I-joist design. Special inspections required for soils, concrete, masonry, wood, post-tensioned concrete, post-installed anchors, fire-rate
BLDG 7 UNITS 110 & 111 Construction of (4) new Duplex Type B buildings, Type V-B construction. Each building is 952 SF with a 209 SF patio. Each building includes two (2) one-bedroom dwelling units separated by required 1-hour fire-rated partitions, complete interior and exterior construction, and associated building systems. All off-site improvements and street frontage landscaping must be installed in the first phase of construction. Ref PMT25-08440 for civil improvements and landscaping. Def
BLDG 12 UNIT 120 & 121 Construction of (6) new Duplex Type B buildings, Type V-B construction. Each building is 952 SF with a 209 SF patio. Each building includes two (2) one-bedroom dwelling units separated by required 1-hour fire-rated partitions, complete interior and exterior construction, and associated building systems. Deferred submittal for engineered I-joist design. Special inspections required for soils, concrete, masonry, wood, post-tensioned concrete, post-installed anchors, fire-rat
BLDG 5 UNITS 107 & 108 Construction of (6) new Duplex Type B buildings, Type V-B construction. Each building is 952 SF with a 209 SF patio. Each building includes two (2) one-bedroom dwelling units separated by required 1-hour fire-rated partitions, complete interior and exterior construction, and associated building systems. Deferred submittal for engineered I-joist design. Special inspections required for soils, concrete, masonry, wood, post-tensioned concrete, post-installed anchors, fire-rat
BLDG 4 UNITS 105 & 106 Construction of (6) new Duplex Type B buildings, Type V-B construction. Each building is 952 SF with a 209 SF patio. Each building includes two (2) one-bedroom dwelling units separated by required 1-hour fire-rated partitions, complete interior and exterior construction, and associated building systems. Deferred submittal for engineered I-joist design. Special inspections required for soils, concrete, masonry, wood, post-tensioned concrete, post-installed anchors, fire-rat