Search Permits
4,234 results · type: plumbing
Rough-In/Set 3 Bathroom group, 1 Kitchen, 1 Laundry Station and 1 hot water heater
4425 HARRIS TRL NW, ATLANTA GA 30327
Adding New plumbing Fixtures to Suite.
Add plumbing for full bath renovation
Provide and install new break room sink/faucet with instant water heater & flood stop under sink.
Interior plumbing installation
0 HARTSFIELD-JACKSON INT'L AIRPORT SW, SITE, ATLANTA GA 30320
Plumbing Demo, 1 lavatory relocation
277 Murray Hill Ave - Sewer Plug
Cap the existing sewer line to the building.
1 gas tankless water heater, 1 dishwasher, 1 disposal, 1 ice maker, 1 sink, 1 pot filler; 1 shower, 1 lavatory, 1 toilet, 3 hose bibs; 1 shower, 1 toilet, 2 sinks, 1 tub, 1 washing machine; 1 toilet, 1 sink, 1 shower.
install 2" drain line.
Interior renovation to second floor primary suite including reconfiguration of bathroom layout and addition of new laundry area.
plumbing for remodel of kitchen and laundry room
New plumbing installation
Capping sewer line for demolition
CONNECTING NEW SEWER LINE TO HOUSE
RESIDENTIAL
Converting tub to shower. Replacing pan, drain, and valves. Using a glass door.
Relocate existing electric water heater from laundry room to southeast corner of garage at existing SFR. Reuse existing hot, cold lines via attic and reuse existing T&P line. Relocate Rheem ProTerra HPWH (XE50T10H45U1) on 18-inch stand with expansion tank and dedicated condensate drain to exterior.
Installation of 110-ft of 2-in PE gas line buried 18-in with 14-gauge tracer wire from gas meter to 400K BTU pool heater. All gas lines are to be installed per 2024 IFGC & SW gas requirements. SW gas to determine if the meter needs to be upgraded.
INSTALLATION OF 158-FT OF 2-IN PE GAS LINE BURIED 18-IN WITH 14 GAUGE TRACER WIRE FROM GAS METER TO THREE 3/4-IN GAS STUBS TO SERVE LANDSCAPE ADDITIONS. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS. COM GAS ENGINEERING (480-644-2909) TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
Tub to Shower in Hall Bathroom at existing SFR - Replace existing wet space with new shower including new valve and prefabricated acrylic walls. No structural changes - will tie into existing piping. No change to overall square footage.
Tub to Shower Conversion in Master Bathroom at existing SFR - Replace existing wet space with new shower including new valve and prefabricated acrylic walls. No structural changes - will tie into existing piping. No change to overall square footage.
Converting shower to shower. Replacing pan, drain, and valves.
adding a gas line to an existing line. The new gas line with be a 2" PE pipe buried no less than 20" with a tracer wire and will connect to the existing 1.5" PE pipe that feeds the 400k pool heater. the new gas line will feed four 20k btu natural gas torches. Ref. PMT26-09824 for the Pergola I will also be installing a 2" PE pipe that will tie into a nipple coming out of the back of the house and will feed a 60k btu natural gas BBQ, a 65k btu natural gas fire pit, and a 20k btu natural gas tor
TO PROPOSE PLUMBING AND GAS WORK FOR EX. STORE IN CONJUNCTION WITH ALT-2 JOB Q01423964-I1 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
plumbing modifications taking place on the 16 floor as per plans filed herewith. No change in use, egress or occupancy
REPLACE AND INSTALL NEW PLUMBING FIXTURES
HEREWITH FILE TO INSTALL NEW ADA COMPLIANCE RESTROOM IN EXISTING CHURCH (SYNOD HOUSE). WORK INCLUDES NEW PLUMBING FIXTURE WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.