PermitDig

Search Permits

244,860 results

INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.

343 MADISON AVENUE, Manhattan
10KOct 30

INSTALLATION OF OUT RIGGER FOR FACADE REPAIR.

32 BROADWAY, Manhattan
Oct 30

INSTALLATION OF MECHANICAL VENTILATION SYSTEM FOR COOKING EQUIPMENT. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION

5 EAST 47 STREET, Manhattan
18KOct 30

Installation of suspended scaffold for facade work or inspection

111 HICKS STREET, Brooklyn
Oct 30

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

30-45 33 STREET, Queens
12KOct 30

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

619 WEST 114 STREET, Manhattan
1KOct 30

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

69-10 YELLOWSTONE BOULEVARD, Queens
12KOct 30

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1349 CROSS BRONX EXPRESSWAY, Bronx
15KOct 30

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

215 WEST 78 STREET, Manhattan
5KOct 30

INSTALLATION OF OUT RIGGER FOR FACADE REPAIR.

42 BROADWAY, Manhattan
Oct 30

Structural work for a two-family dwelling building. No change in use, egress, or occupancy.

359A PROSPECT AVENUE, Brooklyn
5KOct 30

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

456 WEST 18 STREET, Manhattan
1KOct 30

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.

250 WEST 100 STREET, Manhattan
1KOct 30

Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.

1170 EAST 229 DRIVE SOUTH, Bronx
Oct 30

Testing

154 1 AVENUE, Manhattan
10KOct 30

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

307 EAST 93 STREET, Manhattan
1KOct 30

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

128 10 AVENUE, Manhattan
1KOct 30

Installation Of Temporary Dual Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

202 EAST 120 STREET, Manhattan
20KOct 30

INSTALLATION OF HEAVY DUTY SIDEWALK SHED AT REAR COURYARD AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION

219 EAST 42 STREET, Manhattan
21KOct 30

STRUCTURAL MODIFICATIONS TAKING PLACE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

50 HUDSON YARDS, Manhattan
10KOct 30

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

511 5 AVENUE, Manhattan
Oct 30

Install of temp platform & LED wall, no alt to exist structures for Guggenheim Gala event. A TPA is required. Producer is responsible to monitor site safety. All production equip removed upon event completion.

1071 5 AVENUE, Manhattan
5KOct 30

Removal and renovation of existing partitions as per plans filed herewith. No change in use, egress or occupancy.

1 BROADWAY, Manhattan
555KOct 30

FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

39-18 150 PLACE, Queens
52KOct 30

PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

37-56 103 STREET, Queens
8KOct 30

Application herewith filed for construction fence at perimeter of property. no change to use, egress or occupancy.

64-39 110 STREET, Queens
5KOct 30

Filing for mechanical work at the 1st, 6th, and 7th floor. No change to use, egress, or occupancy

88 UNIVERSITY PLACE, Manhattan
176KOct 30

DIRECT REPLACEMENT OF (1) ROOFTOP HVAC SPLIT-SYSTEM HEAT PUMP UNIT ON EXISTING ROOF CURB

1100 SOUTH AVENUE, Staten Island
4KOct 30

INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

157 MASPETH AVENUE, Brooklyn
28KOct 30

Structural modifications per plans, replace damaged joist, new lintels

231 EAST 62 STREET, Manhattan
94KOct 30