Search Permits
249,870 results
Install (2) exterior wall mounted illuminated signs with pan channel lettering, SPECTRUM 36 Sq Ft Each.
Install rooftop solar, battery, and solar carport
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
Desert Uplands Envelope Lot - Construct Swimming Pool & Spa. All work related to swimming pool and spa is within the existing privacy fence and temporary fence. No new disturbance with this permit. The temporary fence is required to remain in place per the approved site plan at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times. Property line fencing is not permitted. A separate zoning inspection is required prior to final buildin
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
Install sensor release electronic locking systems on (3) egress doors at the office of a new hanger building (PMT23-04321). Approved as Noted. Results in CofC.
Modify existing Notifier fire alarm system for replacement AHU and associated shutdown interface. Approved as noted.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install fire sprinkler monitoring system. Ref: PMT25-03073
Install fire sprinkler monitoring system. Ref: PMT25-03227
Install fire sprinkler monitoring system. Ref: PMT25-03563
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
INSTALLATION OF 170 L.F. OF 1-IN IMC CONDUIT, 6-IN BURIAL WITH TWO - NO. 4, ONE - NO. 6 AND ONE - NO. 8 AWG THWN TO 80AMP POOL PANEL FOR A NEW 140K - 71K BTU ELECTRIC HEAT PUMP. ELECTRICAL TO BE INSTALLED PER 2023 NEC REQUIREMENTS AND SRP STANDARDS. NO RECORD ON FILE FOR EXISTING POOL CONSTRUCTED PRIOR TO RECORD KEEPING. ALTHOUGH, EFFECTIVE JANUARY 8, 2026, ALARMS ARE NO LONGER PERMITTED PER THE ADOPTED AMENDMENTS. NO NEW WORK OR CONSTRUCTION UNDER THIS PERMIT. ALL OUTLETS TO BE GFCI.
Install (1) LED illuminated monument sign at the entrance to a new apartment complex. Power to monument sign provided under clubhouse construction permit (PMT25-22789). Results in CofC.
Install (2) new shade structures (952 SF total) at playground area of an existing City of Mesa park. Electrical power to shade structure lighting under site improvement permit (PMT26-05268). Playground equipment installed under PMT26-15046. Results in CofC.
50'X 60' Pre fabricated steel accessory building with electrical
Desert Uplands Envelope Lot - Construct Swimming Pool & Spa. All work related to swimming pool and spa is within the existing privacy fence and temporary fence. No new disturbance with this permit. The temporary fence is required to remain in place per the approved site plan at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times. Property line fencing is not permitted. A separate zoning inspection is required prior to final buildin
Phase 1 and Phase 2 civil drawings for overall site.
BLANDFORD HOMES #3501 The Estates @ Pioneer Crossing - New 2942 SF two story residence with a 2+ car garage at The Estates @ Pioneer Crossing. Includes new water, electric and gas meters. Special inspection for post tension slabs
Build 7,447 SF livable one-story single-family residence with attached garage. Special inspections required for drill & epoxy, field welding, masonry construction, soils, PT slab, and structural ICF walls. Deferred truss calculations. Existing 1 1/2-inch water service line. New 1-inch water meter.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (26) ROOF MOUNTED SOLAR PANELS, (26) MICRO INVERTERS, ONE 60A LINE SIDE TAP, 11.180 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Basic electrical work for addition. Lights, receptacles, switches.
Please do not request inspections under this permit until 2 business days after permit issuance.Meter Enclosure, New Main Breaker Enclosure 200 amps PEPCO
Please do not request inspections under this permit until 2 business days after permit issuance.EV Charger Install
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (22) ROOF MOUNTED SOLAR PANELS, (22) MICRO INVERTERS, ONE 45A LINE SIDE TAP, 9.460 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance.Primary wiring of new 400a dwelling.
Please do not request inspections under this permit until 2 business days after permit issuance.Primary wiring of new 400a dwelling.
Please do not request inspections under this permit until 2 business days after permit issuance.Replace existing 120-240v 200amps electrical panel
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL 100 AMP SUBPANEL, RECEPTACLE