Search Permits
18,284 results · type: plumbing
ePlan: Commercial Expedited Review - Interior Remodel to Existing Energy X Office Building (2575 SF)
ePlan: Expedited Review - Phase 2 - Shell renovations to Atrium Fire Suppression System Smoke Evac System Walkways Int. Storefront Paseo and Restrooms in Section 130 (175935 SF). Total area for Core & Shell (1181697 SF) (142143146147-Level 1 and Level 5 Fire suppression Fire Alarm Emergency lighting and Stairwells o 141144145148 - All Levels - Fire suppression Fire Alarm Emergency lighting and Stairwells)
Emergency Repair section of 4 Domestic Water line at Travis High School. Work was conducted over the weekend. We would like to have this inspected as soon as possible to cover up this area and have concrete poured back.
New construction single-family residential 2-story 5 bedroom 3 bath with covered front porch
Replacement of an existing water heater 40gal gas tank located in an attic
Interior remodel of 2100 sqft of existing boxing gym space. Create a new pilates and Yoga studio completed in 1 phase.
install a full lawn sprinkler system
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
New Sewer Service – 9638 E Balsam Ave - County Island APN: 22037057
install new Navien NPE 240A tankless water heater
PLUMBING PERMIT TO REPLACE EXISITING WET SPACE WITH NEW SHOWER IN GUEST BATHROOM, INCLUDING NEW VALVE AND PREFABRICATED ARCYLIC WALLS. NO STRUCTRUAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Emergency Whole Home Sewer Replacement Like for Like
Guest Bathroom: Like-for-like shower replacement with 60x34 low-profile shower pan, center drain, no drain relocation. Install new shower wall surround and sliding glass doors: no structural changes.
Shower Remodel in Master Bathroom - Replace existing wet space with new shower including new valve and prefabricated acrylic walls. No structural changes - will tie into existing piping. No change to overall square footage. No electrical work.
plumbing
plumbing
plumbing
FILING FOR NEW PLUMBING FOR ONE FAMILY RESIDENTIAL BUILDING
Modifications to the existing plumbing system on the 20th and 21st floors (TD Securities- Marketing Floors 21 + 22) as per plans. No change to use, egress or occupancy.