Search Permits
11,718 results · type: mechanical
ePlan: Commercial Expedited Review - New Apartments - below the Podium - Club Leasing Mail and Shell Area for Residential Service Provider (see separate application).
mechanical
mechanical
Telehandler Use to Hoist Material
Installation of a temporary overhead protection via shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
TEMPORARY ROOF PROTECTION AT THE ADJOINING PROPERTIES DURING NB CONSTRUCTION FILED SEPARATELY UNDER APP # M00907417. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY ROOF AND SUNLIGHT PROTECTION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
Telehandler for Building Construction
MECHANICAL MODIFICATIONS TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
mechanical means to assist with full demolition on grade, as per HPD ED
MECHANICAL FILING DESIGN INCLUDES THE INSTALLATION OF NEW SPLIT / VRF HEAT PUMPS FOR THE SPACE HEATING OF THE COMMERCIAL OFFICE SPACE WITH DIRECT FRESH AIR CONNECTION FOR VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
PROPOSE TO INSTALL A 3-TON WATER SOURCE HEAT PUMP ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH.
Mechanical work as shown on plans filed herewith.
INSTALL NEW HVAC UNITS AT 2ND AND 3RD FLOOR RESIDENTIAL APARTMENTS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
MODIFICATION OF MECHANICAL ON 4TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical plans filed herewith to show duct work in Control Room 49. No change to use, egress, or occupancy.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton 2 stage gas horizontal (downstairs)
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4.5bath] with Attached Carport.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2T vert gas
New 1-story single family residence 4 bed/3.5 bath with attached garage covered porch and covered patio Green Building
Replacement of complete existing central heat and air system with or without duct work Install new 3.5-Ton Goodman 14.3-SEER Electric AC & Gas Heating System
Replacement of complete existing central heat and air system with or without duct work *2 Systems* Like for like 2.5 ton horizontal gas 2 ton horizontal gas
Replacement of complete existing central heat and air system with or without duct work 2T vertical two stage gas ductwork insulation comp.
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [4bed 3.5bath] with Attached Carport. Unit 1A
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 ton 2 stage gas horizontal