Installation of high pile combustible storage racking. Special inspection for post installed anchoring. Results in CoC.
Replacement of 3/4" backflow Assembly located in the pool pump room INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
PBI - ELECTRICAL - Like for like replacement of the 4 meter pak panel supplying power to units #25, #26, #27, & #28. There will be no change in electrical loads/amps. Electrical panel replacement will comply with 2023 NEC.
Exterior modification to existing, type VB construction, A-2 occupancy Korean BBQ restaurant. Modification include demo of exterior decorate Vigas around bldg, log wall finish adjacent to chimney and false windows to be removed at east elevation, modification of parapet at east wall elevation above entry, and north and south elevation. New stucco patch, paint and revised tops of parapet walls. Reviewed with Stips - Building signs by separate permit. REF: PMT26-10684 Interior TI. Results in CofC.
Open a new office with Removal of Walk in Cooler. The preious tenant was a retailer as well so COO is the same. We just need to get permit done so we can get a sign hung outside.
Fire Alarm Dialer: Installation of a fire alarm dialer with up to 5 devices – no plans required. Installation shall comply with the City of Mesa codes (IFC, NEC and NFPA 72). Fire inspection required.
Installation of 4 ABB A400 EV chargers and accompanying transformer and switchboard in the Walmart parking lot.
EXTERIOR STORAGE UNIT 7'X7' TO BE PLACE ON A CONCRETE SLAB EXISTING GRADE. STORAGE USE OF ALUMINUM-MAGNESIUM ALLOY. ADDITIONAL INFORMATION IS PROVIDED IN A TECHNICAL MEMORANDUM BY GHD INCLUDED WITH SUBMITTAL. LOCATION OF SLAB AND 7'X'7 ALREADY HAS BEEN APPROVED BY THE AIRPORT FACILITIES.
Group B and U occupancies. Type V-B construction. 4,677 SF. Occupant load 65. New office building with private garage. New structural, architectural, and MEP. New (1) 1.5-inch domestic water service with 1.5-inch water meter. New (1) 3/4-inch or 1 inch landscape water service and 3/4-inch water meter. New electrical meter 400A 3 phase. Results in CofO.
Installation of solar photovoltaic energy generation system on fuel island canopy(ies), including trenching to back exterior wall of store for feeder conductors to utility line side interconnection
Replace antennas at existing telecommunications tower site. Approved as noted. Results in CofC
New 3,143 SF single story Amenity Building within a larger community development. Facility will includes restrooms, open breezeway patio, and pool equipment yard to support the adjacent community pool. Building will be exposed steel structure canopy with a standing seam roof and exposed masonry construction.
Pre-fabricated Guard Booth with foundations
new building - engineering, landscape, architectural, structural, mech / plumb, electrical
ADMINISTRATIVE USE PERMIT PER SEC.11-70-3 OF THE ZONING ORDINANCE FOR A TEMPORARY SALES OFFICE AND MODEL HOME COMPLEX WITHIN A RESIDENTIAL ZONING DISTRICT FOR HOMES BEING CONSTRUCTED IN THE IMMEDIATE SUBDIVISION, SUBJECT TO THE SITE PLAN APPROVED WITH THIS PERMIT. APPROVAL OF THE SALES OFFICE AND MODEL HOMES MAY BE GRANTED FOR A THREE (3) YEAR PERIOD, OR UNTIL ALL HOMES IN THE SUBDIVISION ARE COMPLETED, WHICHEVER OCCURS FIRST. ORD. 873 ALLOWS EXTENSION IF NEED IS SHOWN. GARAGE AREA MODIFIED OR
Construction of new 1,311 SF dining room addition along main street, type V-A construction and Group A-2 occupancy: Mechanical, Plumbing and Electric on new addition. Remodel of existing parking lot and landscaping. Special (structural) Inspections required for Steel, Concrete, wood construction and post-installed anchors. (Electrical) switchboard, panel boards and motor control centers. Deferred fire alarm. Deferred smoke detection system. Results in CofO.
Fire Alarm TI. Adding NAC and monitor devices to existing system.
Install Storage Racking System
Commercial Building Permit
Commercial Building Permit
Fire Alarm Modification for Elevator 5 and 6 upgrade. Elevator 5 and 6 will be upgraded with shunt. Smoke detectors are existing with no changes. Relays will be upgraded and shunt relay added as new. Heat detectors will be new. Results in a CoC.
Building #3. New 225,606 sf 2-story data center. IIB construction. B/ S-1 occupancies. Unlimited building with 60ft min. yards. Special inspections required for fabricator, steel, concrete, soil, fire caulking and emergency responder radio coverage. New 2" domestic water meter, and new 1" landscape meter. Deferred fire sprinklers and fire alarms. Permit PMT24-17530A modified the separation between Buildings 3 and 6 and included a code analysis evaluating the structures as portions of a single bu
New Shell Building C-Store fueling station type V-B construction, 4,816 SF and 286 SF of canopy. New electric meter, gas meter, 2-inch domestic meter, and 1-inch landscape water meter. Deferred fire sprinkler and fire alarm. Special inspection for structural items. Refer to PMT24-22043 for Civil. CofC only.
New 75,458 SF shell industrial building, type III-B construction. (2) new electric meters and 2-inch domestic water meter. (Ref: PMT25-10017 for foundation permit). Deferred fire sprinkler with fire pump, fire alarm, trusses, roof access, and vehicle access gate. Special inspection for structural items, electrical, and Emergency Radio Responder Coverage. Refer to Civil under permit PMT25-03332. Results in a CoC.
New 67,158 SF shell industrial building, type IIIB construction. (Ref: PMT25-10019 for foundation permit). (2) new electric meters and 2-inch domestic water meter. Deferred fire sprinkler, fire alarm, trusses, roof access and ladder, and vehicle access gate. Special inspection for structural items, electrical, and Emergency Radio Responder Coverage. Refer to Civil under permit PMT25-03332. Results in a CoC.
Existing warehouse building. New electrical 200A 3 phase meter and interior panel for lighting. Results in CofC.
Existing warehouse building. New electrical interior panel for lighting. Results in CofC.
Modify existing fire alarm system by adding (6) ceiling mounted horn/strobes and (10) ceiling-mounted strobes for tenant improvement. Please reference PMT25-19822. Approved as noted.
New construction of a 1,114 SF, type VB construction, group B occupancy Dutch Bros Coffee Stand with 834 SF of Canopy for (1) drive-thru window and (1) walk-up service window. No indoor seating or interior access to the public. Site development include a small parking area, (2) drive aisles and a trash enclosure. Special inspection req for Masonry, Wood and Soils. Exist 2-inch domestic meter to be relocated. Deferred Roof trusses. Deferred fire sprinklers and CO2 monitoring. Results in CoO.
Interior modification to existing baler/process area. Construct new 8-inch CMU wall and associated concrete curb to provide a 1-hour fire-resistance-rated separation between the existing F-1 Baler Room and H-3 Extruder/Open Process Area. Work includes demolition of existing door/wall components, modifications to existing openings, relocation of affected equipment/controls, and associated structural work. Existing building is Type II-B construction and fully sprinklered. Special inspections requi