Search Permits
249,120 results
Pool 30x16ft with spa 8x8ft. Gas heater and autofill.
Installation of New Irrigation
2026/10/02 - 2026/10/04 - Weekend 1| 2026/10/09 - 2026/10/11 - Weekend 2 | (2026/09/14) | Music stages food vendors art vendors & hospitality programs. October 2-4 & 9-11 2026 in Zilker Park.
Replace an existing old overhead service with a new meter can and a new main breaker box.
Replacement of complete existing central heat and air system with or without duct work Like for like 3 ton vertical gas
Gas test gas was turn off and customer need gas test
Installation of New Irrigation
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Garage. Bldg 2
Installation of New Irrigation
Installation of New Irrigation
Installation of New Irrigation
Electrical
Addition
Insulation
Plumbing
Interior/Exterior Work
Electrical
FOR PERMIT 101061512: REPLACEMENT PLUMBING CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE.
LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 3 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: BASEMENT.
LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: BASEMENT.
LINE VOLTAGE ELECTRICAL WORK. INSTALL SYSTEM III EMERGENCY LIGHTING. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: BASEMENT, OUTSIDE AND INTERIOR HALL.
temporary pole for new construction for Stoney Chase Ref 2026-123831 BP
BLDG 2: New 3-story detached residence 3 bedroom 2.5 bathroom Part of 3-unit use.
Interior remodel combining existing side-by-side half bath and full bath into one single primary bath. The basic area footprint of the bathroom space is not changing in size. Additional sheetrock work needed in the hallway outside the bathroom to enclose the area that previously housed the old HVAC system. A new unit was relocated and installed in the attic.
ePlan: Commercial Expedited Review -New Construction of New Carport (945 SF).
Addition of SFR
ePlan: Commercial Expedited Review - New Construction of New Detached Garage (2059 SF).
Express: Existing foundation repair as per scope of work attached.
Excavate 40 to repair break in the yard line
*Smart Housing*Green Building* New construction single-family residential Condo 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio.