Search Permits
249,120 results
Install a new 60A circuit in the 100A garage subpanel and route wiring in surface-mounted conduit directly adjacent to the subpanel Hardwire the Emporia Pro NACS and configure to draw up to 48A continuous.
Need permit for temporary power ref; 2026 012820 BP
Tenant improvement to existing space (formerly CVS) for Dollar Tree. Scope includes updating finishes and fixtures New RTUs at existing locations and MEP work as needed.
New pool with required enclosure (heater or autofill)
New 2-story Condo SF Residence 4 bedrooms 3 bathrooms
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 519
BASE: Installing a backup battery system and additional meter socket.
Replacement of complete existing central heat and air system with or without duct work
50 tunnel
ePlan: Commercial Expedited Review - First Time Finish Out for Phase 4 Multi Family Building.
BASE: Installing a backup battery system and additional meter socket.
Express: Foundation repair - install 26 push piers
Installation of 10.56kw PV Solar system.
REVERSE CHANNEL LETTERS MOUNTED WITH SPACERS DIRECTLY TO THE WALL.
Addition and remodel extending dinning room and remodel of kitchen
TEMPORARY BUILDING PERMIT - Scope is limited to structural foundations for the Factory building for Project Toaster including piles grade beams stem walls concrete floor slabs and associated reinforcing bar.
Excavate 20 to repair break in the yard line
Demo existing pool and re-build pool spa and concrete deck 372 sf pool and 39 sf spa
Change of Use from Office to Retail and interior Remodel of an Existing space includes new lighting for a retail sports and collector cards occupancy. 2026 108700 DA - Approved
Replacing subpanel due to fire damage by vandalism.
Mciver - 40-18701 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps.
BASE: Installing a backup battery system and additional meter socket.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - First Time Finish Out for Phase 6 Multi Family Building.
New pool for single family residence (no plumbing permit).
Replace water heater with tankless water heater.
Replacement of complete existing central heat and air system with or without duct work
Garage conversion/Interior remodel convert garage into conditioned space to create bedroom. Structural interior remodel of existing 2-story single family residence. Interior remodel includes kitchen/bathroom/utility room. Vaulted ceilings in master bedroom and living room. 5 bed/2.5 bath
additionof attached screened porch. Composite Deck 19x16 and a screen enclosed covering lean-to style roof cover
*SMART Housing* *Green Building* New 1-story 3 bedroom 2 bathroom single family residence with attached garage covered front porch and rear covered patio.