Search Permits
187,813 results
Sewer line repair via tunneling Yard sewer line repair
Express- Remove and replace siding replace windows like for like. Replace front door. REVISION 1: Add EP
We will be adding a Level 2 EV charger
New construction of single family dwelling with 5 bedrooms and 4.5 baths 3 car garage rear patio and front porch PUD
HOME BUILDERS LOOP for New SFR COA BP: 2026-077816 Bluebonnet
Converting the main electrical service from overhead to underground using the new underground infrastructure and pull boxes that were installed by other as part of the secondary utility conversion for Austin Energy WO# 532861. Per EC meter work is being done (6/26/26)
Replacing the backflow device for the pool
MEP systems upgrade and expansion along with addition of server rack and associated equipment in an existing building. **Rev #1: LAB MEP Equipment Upgrade to include new canopy and foundation pad. -AP 5/26/26 **
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton AC Condenser and 3 Ton Air Handler
Replacement of complete existing central heat and air system with or without duct work *KATE WANSTROM: Replace existing 2-ton HVAC package system with a like-for-like full system changeout; no structural change.
Install of solar panels
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [3bed 2bath] Work to include: Interior remodel First floor addition new office new rear patio.
New SFR 2- Story 3 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio PUD
Condominium renovation includes kitchen bathrooms and bedrooms for Unit 2007
*Green Building* New 2 Story Condominium Single Family Residence 2 Bdrm 2.5 Bath Porch w/ 2-Car Garage
Express: Replace 2 windows (like for like)
Construct new driveway approach of 16.3 FT and sidewalk of 131.7 LF with ADA ramps
ePlan: Commercial Expedited Review - Interior Remodel to Existing Gun Shop Scope of Work to Include replacement of Existing Porch and Additional Pedestrian Areas are Being Added over Current Parking Spaces (7225 SF).
PB- New construction 2 story 3 bed 2.5 bath
Installing new grinder pump at the home and connecting to the city tap. Will be setting in new basin pump and electrical to the pump.
TEMPORARY TPOLE FOR NEW CONSTRUCTION IN STONEY CHASE ref. 2026-078339 BP
Install Level 2 EV Charger
Replacement of complete existing central heat and air system with or without duct work
Install a hardwired electric vehicle charger.
ePlan: Commercial Expedited Review - New Construction of 5 Service Center Bldgs. New Building - Public Safety Service Center - Business & Customer Service Space and Service Center for Heavy Duty Vehicles.
ePlan: Expedited Review - New Construction of a 4-Story Multi-Family Bldg. with Private Parking Garage- Fire Area A (45158 SF)
Exterior work only site work for ADA accessible route porch to be re-built for future ADA access from future lift. No interior work future tenant will apply for their own permit.
Application 1. First generation interior tenant office space. Includes typical private offices open office workstations conference rooms. Breakroom is NOT getting built out. This is the only permit for Suite 300.
Replacement of complete existing central heat and air system with or without duct work
Total Demo of detached dwelling 1052 sq ft circa 1993 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***