Search Permits
16,709 results · type: electrical
7 DAY - involves building 2-hour walls around the existing boilers to create a dedicated boiler room inside the existing CUP remove the indoor domestic water storage tank and install a new domestic water storage tank on new concrete pad outside of the CUP - OVA
Express: 2nd floor renovation to include plumbing for replacement of tub and surround toilet faucets and vanities in relocation of fixtures updating the electrical to meet current code new tile and laminate flooring to be installed replace vent fan in bath
CHANGE OF USE RETAIL TO RESTAURANT will be a small primarily grab and go QSR see operations document attached for more detailed information
200A Underground Service Upgrade.
Porch enclosure
New construction accessory use in-ground pool.
*Green Building* New 2-story 3 bedroom 2.5 bathroom single family residence with covered front porch and rear covered patio.
New 1 story single family residence with 3 beds 3 baths attached 2-car garage includes a bedroom/bathroom (casita) attached to primary portion of the dwelling via breezeway. Production builder. PUD
Install Level 2 EV Charger
ETJ. New Service for SFR.
Temporary meter loop existing meter loop to be removed to make room for home addition will be a CUT OVER.
ETJ. New Service for SFR.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
INTERIOR REMODEL -REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MATCH BASE BUILDING EXISTING STANARDS.ALL CONSTRUCTION SHALL BE NON-COMBUSTIBLE. 4. ALL WOOD AND WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED
New pre fab pool
New pool (autofill) Bldg 3 pool 120
homebuilder loop 2026-120977 BP
Certificate of Occupancy with Change of Use from Retail to Sweepstakes Gaming Parlor.
ETJ. Full Service Upgrade.
Install three-quarter EMT rain tight conduit and fittings from main panel roughly 30 feet down the same wall to the factory supplied spa sub panel. Make final connections. Bear Electric scope of work starts and stops from panel to panel.
Putting in a 60a EV charger.
Invoice Level 2 EV Charger
Replace service pole that is falling over with new pole 200A meter base and 150A electrical panel
ETJ. New Service for SFR.
Inground pool and spa; no decking
Replace panel and meter with new permanent pole.
One story tenant build out within an existing shell building
BASE: Installing a backup battery system and additional meter socket.
Circle K Pole Sign