PermitDig

Search Permits

4,292 results · type: electrical

Electrical

147 Neponset AV, Dorchester
2KJun 26

Electrical

180 Tremont ST, Boston
55KJun 26

Electrical

28 Sheffield RD, Roslindale
1KJun 26

Electrical

11 Hobson ST, Brighton
8KJun 26

Electrical

7 Hilburn ST, Roslindale
1KJun 26

Electrical

15 Colborne RD, Brighton
2KJun 26

Electrical

659-665 Washington ST, Boston
122KJun 26

Electrical

1249 Boylston ST, Boston
4KJun 26

Electrical

148H-150 Prince ST, Boston
25KJun 26

Electrical

9 Buchanan RD, Roslindale
4KJun 26

Electrical

75 Nottinghill RD, Brighton
58KJun 26

Electrical

49 Industrial DR, Hyde Park
6KJun 26

Electrical

34 Halsey RD, Hyde Park
1KJun 26

Electrical

31-35 Charles ST, Boston
20KJun 26

Electrical

65-85 Kneeland ST, Boston
60KJun 26

Electrical

120-126 Emerson ST, South Boston
9KJun 26

Electrical

33 Pomfret ST, West Roxbury
6KJun 26

Electrical

329 Park ST, West Roxbury
4KJun 26

Electrical

250 Everett ST, Brighton
5.9MJun 26

Electrical

115 Federal ST, Boston
1KJun 26

Electrical

14 Buswell ST, Boston
5KJun 26

Electrical

600 Atlantic AV, Boston
75KJun 26

Electrical

14 Buswell ST, Boston
5KJun 26

Electrical

16 Alaric ST, West Roxbury
1KJun 26

Electrical

110 Broad ST, Boston
3KJun 26

PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR

3030 E PUEBLO AVE, Mesa
Jun 26

INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.

1367 S COUNTRY CLUB DR 1011, Mesa
Jun 26

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

5155 E ESCONDIDO CIR, Mesa
Jun 26

Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. We will replace your existing 200amp 120/240volt Main Electrical Panel with a new 200amp 120/240volt All-In-One electrical panel, the new panel will be PV ready.

2901 S LAS PALMAS, Mesa
Jun 26

electrical

481 BEACON HILL CIRCLE, Norfolk
0KJun 26