Search Permits
186,904 results
TAYLOR MORRISON #3517 - New 1832 SF single story residence with a 2 car garage and a 2+ car garage option. Built at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs. See MST23-15066 for parcel a,b,d,e of Hawes crossing. Addenda MST25-01482 Add Parcel H & F information: Revised parcel A, D, B & E information. Square footages updated for both MST23-15066 & MST25-01482.
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. New structural and electrical. Special inspections required: steel construction, concrete construction, soils, anchor bolts/post installed anchors. Results in CofC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Foundation Permit Only. (6) 952 SF, construction type V-B, R-2 occupancy apartments with 209 SF patios. Special Inspections Req for Soils and Post-Tensioned Concrete. Results in CoC.
Demolish existing 60 in × 30 in tub/shower combo and toilet in guest bathroom: install new 60 in × 30 in low-profile shower pan, Durabath wall panels to 96 in height, Moen valve/showerhead, three corner shelves, one 18 in grab bar, sliding glass doors, and set customer-supplied toilet. No structural change to walls, layout, or plumbing locations.
Replacing hot and cold fresh water pipe in a 2-bathroom house. Previous materials were a mix of copper and Pex and proposed to be replaced with all Pex throughout. Pinhole leaks were found in various spots that warranted replacement of the pipes.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Foundation Permit Only. (4) 952 SF, construction type V-B, R-2 occupancy apartments with 209 SF patios. Special Inspections Req for Soils and Post-Tensioned Concrete. Results in CoC.
Type V-B construction. Group B occupancy. 2,232 SF. New partition walls to create exam rooms, comfort room, receptions area, janitors closet, ADA compliant restroom, surgery room, x-ray room, break room, and ward. New architectural and MEP. Special Inspections Required: Medical Gas and Vacuum Systems. Deferred fire sprinklers and fire alarms. Results in CoO.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a 200A service upgrade.
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building