Search Permits
248,074 results
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
FOR PERMIT 101069206: REPLACEMENT PLUMBING CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE.
INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTPUT: 8.55 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF PLANES OF HOME. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0817.
LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: METER - METER ENCLOSURE REPLACMENT.
INSTALL SOLAR PANELS ON ROOF OF ACCESSORY BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTPUT: 2.7 KW. LOCATION: ROOF PLANES OF DETACHED STRUCTURE. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0817.
PURPOSE: NEW/REPLACEMENT INSTALLATION. WOOD FENCE - 6'-0' ' (HEIGHT) X 217'-8' ' (LENGTH). LOCATION: SIDE AND REAR YARDS, HOUSE TO ALLEY.
INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OUTPUT: 13.95 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF PLANES OF MAIN HOUSE. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0817.
SCOPE OF WORK: SPR 2019 CBC: CONVERT FROM SINGLE FAMILY RESIDENTIAL TO 2 FLAT BY LEGALIZING FIRST LEVEL STORAGE INTO A DWELLING UNIT. SUBSTANTIAL REHAB TO INCLUDE NEW EXTERIOR SIDING. REPAIR OF FIRE DAMAGE. NEW BATH. BASEMENT TO INCLUDE 1 NEW BATH, 1 NEW KITCHEN PER PLANS. REAR YARD TO INCLUDE 2 PARKING SPACES. GROUP R5 TYPE V CONSTRUCTION.
LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 400 AMP SERVICE DISCONNECTING MEANS WITH 24 CIRCUITS. RECEPTACLE OUTLETS: 3 . LIGHTING OUTLETS: 6. SPECIFIC LOCATION: BASEMENT.
SPR 2019 CBRC: COACH HOUSE DWELLING UNIT ERECTION OVER EXISTING GARAGE INCLUDES NEW ACCESS STAIR, AS PER ADU PRE-CERTIFICATION APPROVAL (OCCUPANCY GROUP R-5; TYPE V-A CONSTRUCTION)
EMERGENCY WRECK AND REMOVE A 1 STORY MASONRY BUILDING
COMPLEX DEMOLITION: WRECK AND REMOVE A 2 STORY FRAME RESIDENCE AND A DETACHED FRAME GARAGE
WRECK AND REMOVE A 2 STORY FRAME MULTI UNIT RESIDENCE AND A DETACHED FRAME GARAGE
COMPLEX DEMOLITION: WRECK AND REMOVE A 1 STORY OVERSIZED GARAGE ON THE CORNER
WRECK AND REMOVE A 2 STORY FRAME MULTI UNIT RESIDENCE AND 1 DETACHED STANDARD SIZE GARAGE
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
Internal A D U Conversion. A Galley Kitchen, Heating, Cooling, And Hot Water Heater Will Be Added To Room With (E) Bathroom And Entry.
Demolition Of 180sf Enclosed Parking Structure. Per C E Notice - Illegal Accessory Structure. B W O P
Install (5) new HVAC RTUs at existing building for the warehouse area and associated electrical. Special Inspections Required: Wood construction. Deferred fire sprinklers. Approved as Noted. Results in CofC
CONSTRUCT A 351 SF SWIMMING POOL NO SPA/NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
Addition of two dog park cells at existing dog park area in City of Mesa park. Install new water fountain and tie water line to existing water fountain supply line. Install new sight lighting and tie into existing electrical meter. Install new chain link fencing and gates. Install (2) 2-inch landscape water services and (2) 2-inch water meters. Results in CofC.
Replace beverage equipment and associated MEP with new. Demo identified equipment, drains, water lines, refrigeration lines, and floor sinks. Remove power back to electrical panel for demolished equipment. Install new equipment, waste lines floor sinks, water lines, beverage lines, power for new equipment. Replace existing RTU glycol chiller condensing unit with new. Results in CofC