ePlan: Residential Expedited Review - Addition and Remodel to Existing to Existing 1-Story Single Family Res. Interior remodel Conversion of existing garage to living space addition of attached garage addition of unconditioned storage room remodel of existing patio damaged by previous foundation repairs related site development BP 2023-034748 Foundation Repair
EXPRESS: Demo old wet space install new shower
(Mckay Karolyn) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Total demo of sfr 1000 sqft circa 1952
(Tarlecki Adam) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
New construction of 1 story single family residence with 4 beds 3 baths attached 3 car garage covered entry porch and patio PUD
Replacement of complete existing central heat and air system with or without duct work Like for like 2.5T horizontal gas
Reattach underground riser to modular meters.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Like for like 3 ton 2 stage vertical gas
Remodel of tenant space for office
Gas company turned off gas because of a leak. we found leak on underground gas line to gas grill. customer said the did not want to replace the line and would just by a propane grill so we disconnected underground line to grill and capped off the line. Pressure tested the sytem and it holds pressure. gas is still off pending permit and inspections
Replacement of complete existing central heat and air system with or without duct work Like for like 3 ton vertical gas
Construct new driveway approach of 12 FT
Remove and replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modifications to exterior walls parking sidewalks or landscape.
New in ground pool and spa
Replacement of complete existing central heat and air system with or without duct work
New construction of 2 story sfr 4 beds 2.5 baths attached garage
First tenant improvement for Buffalo wild wings 1270 SQFT.
Interior remodel for tenant occupancy combining two suites into a single suite. NO CHANGES TO OCCUPANCY TYPE OR EXTERIOR WORK. No mechanical scope. No access control. Deferred submittal requested for stairs.
Express- Foundation repair on a slab foundation. Install 6 total press piling pier locations along perimeter. There will be 0 breakthrough and patched locations. Improve level.
Install Level 2 EV Charger
Reconfiguration of floorplan for accessory structure. Conversion of porch area living space. taking back to studs/framing. The original accessory structure was built without a permit in the 1980s after the main house was built in the 1950s hence it is Accessory Use to Primary New to retroactively cover the original work to-remain.
Replacement of complete existing central heat and air system with or without duct work Like for like 3.5ton horizontal gas
*Partial Demo. Over 50% of exterior walls* ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [3bed 2.5bath] Work to include: First floor addition Second Floor Addition Interior remodel new beds new baths [5bed 4.5bath].
ETJ Relocate existing overhead service mounted on Austin Energy utility pole to Google distribution cabinet via existing secondary riser underground conduit.
Replacement of complete existing central heat and air system with or without duct work Like for like 3 ton horizontal propane 2 stage system
Replace Dual Check Backflow Preventer at 12405 Bluestone Cir
Express: Foundation repair on a slab foundation. We intend to install 8 total press piling pier locations along the perimeter. There will be 2 breakthrough and patched locations. We will improve level.
125a (200a Meter) Overhead Temporary Power post Ref: 2026-114401-BP