PermitDig

Search Permits

11,718 results · type: mechanical

Replacement of condenser BLDG 10 -Units 3077 3078 1076 1074

1600 WICKERSHAM LN, AUSTIN
Oct 2

Interior Remodel - Restrooms - The Unisex Restroom will remain available while the Men & Ladies Room are under Construction. Once they are completed the unisex restroom will be remodeled.

835 W 6TH ST UNIT 1100, AUSTIN
Oct 2

mechanical_permit_(r)

262 S LAKESHORE DR, Baton Rouge
Oct 2

mechanical

2729 MARLBORO AVENUE, Norfolk
0KOct 2

REPLACEMENT OF EXISTING HVAC UNITS. ON EXISTING STEEL DUNNAGE.

70-60 83 STREET, Queens
50KOct 2

Installation of a temporary overhead protection via shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application

41-31 68 STREET, Queens
3KOct 2

INSTALLATION OF UDPATED MECHANICAL SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

55 HUDSON YARDS, Manhattan
86KOct 2

TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

325 PARK AVENUE, Manhattan
2KOct 2

REPLACEMENT OF EXISTING HVAC UNITS ON STEEL DUNNAGE.

120 JEWEL STREET, Brooklyn
52KOct 2

Installation and use of temporary mini crane construction equipment as per plans filed herewith.

240 GREENWICH STREET, Manhattan
5KOct 2

Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

812 5 AVENUE, Manhattan
3KOct 2

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.

1066 UNIVERSITY AVENUE, Bronx
1KOct 2

APPLICATION IS FILED FOR THE CONSTRUCTION OF A 2-FAMILY, 2-STORY DETACHED RESIDENCE ON (1) ZONING LOT AND SEPAREATE TAX LOT. NEW CERTIFICATE OF OCCUPANCY TO BE ISSUED UNDER THIS APPLICATON. ALL WORK AS PER PLANS SUBMITTED HEREWITH.

44 LANDER AVENUE, Staten Island
Oct 2

Filing herewith for installation of HVAC equipment

60-05 WOODHAVEN BOULEVARD, Queens
162KOct 2

Install new HVAC units and modify existing mechanical exhaust/ventilation for kitchen as per plans.

480 CANAL STREET, Manhattan
75KOct 2

PROPOSED MECHANICAL WORK FOR AN EXISTING 2-FAMILY & 2-STORY SEMI-DETACHED HOUSE

107-31 122 STREET, Queens
30KOct 2

Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy

277 PARK AVENUE, Manhattan
778KOct 2

Target: Modifications to the Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01411076-I1 (GC)

112 WEST 34 STREET, Manhattan
6KOct 2

REPLACEMENT OF THE CHIMNEY AT THE ROOF LEVEL ONLY INCLUDING MINOR MASONRY WORK, LINER REPLACEMENT, WITH ASSOCIATED MECHANICAL AND STRUCTURAL WORK. THE EXISTING MEMBRANE ON THE ROOF FLOOR IS TO REMAIN. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY.

343 WEST 21 STREET, Manhattan
26KOct 2

REPLACEMENT OF EXISTING HVAC UNITS ON EXISTING STEEL DUNNAGE.

120 JEWEL STREET, Brooklyn
175KOct 2

REPLACEMENT OF EXISTING HVAC UNITS ON EXISTING ROOF CURB & STEEL DUNNAGE.

120 JEWEL STREET, Brooklyn
70KOct 2

INSTALL NEW EMERGENCY GENERATOR AS PER PLAN, RELATED TO NEW BUILDING X00658434.

2443 POPLAR STREET, Bronx
10KOct 2

Mechanical work for it rooms. No change in use egress or ocupancy.

409 EAST 60 STREET, Manhattan
550KOct 2

ePlan: Commercial Expedited Review - New Garage - also contains Maintenance.

1124 CLAYTON LN, AUSTIN
Oct 1

Esparanza S426 D Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.

9413 FURMAN DR, AUSTIN
Oct 1

CHANGE OF USE CHURCH TO PRIVATE SCHOOL-conversion of existing Christian life center to become middle school

11400 N MOPAC EXPY SVRD SB, AUSTIN
Oct 1

3ton premium gashorizontal 2 speed american standard new drain pan drain monitor new disconnect new slab surge protection

1036 LIBERTY PARK DR BLDG 1, AUSTIN
Oct 1

Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system

1506 AIREDALE RD, AUSTIN
Oct 1

ePlan: Commercial Expedited Review - New Apartments also contains 3rd Floor (Level 1 Plans) Fitness Lounge Business Center and Activity Center and 7th Floor Lounge (Level 5 Plans).

1124 CLAYTON LN, AUSTIN
Oct 1

New two-story SFR *PRODUCTION BUILDER- SMART HOUSING / GREEN BUILDING* 4 bed 3.5 bath with attached garage front covered porch rear covered patio

6404 MC MURTRY ST, AUSTIN
Oct 1