Alternations to Apple’s existing MSC02 site facilities located in Mesa, Arizona supporting improvements for the installation of four (4) dual EV chargers in the south administration parking lot near the administration break-room patio tying into the existing PV system.
NTT Global Data Centers Americas is adding an additional Data Center building in Mesa, Arizona as part of a 244MW master planned site. PH6 will consist of 8 vaults with prefabricated UPS electrical power modules, generators and closed loop air-cooled chillers located on the exterior. The initial buildout will consist of a core and shell, underground utilities and equipment pads, and a single 8 MW vault with 56 MW future vaults 2 through 8. The envelope will consist of tilt up concrete panels wit
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
4 story wood framed hotel with 174 guestrooms, amenities include full restaurant, event lawn and pool area. Deferred fire sprinklers/standpipes, fire alarms, hood suppression, and canopies. Special inspections for emergency response radio communications and fire caulking. 2 - 2" Domestic Water Meters Manifolded, 1 - 1" Landscape Water Meter. 2" Service Line for future building. Meter will not be set with this PMT.
New shared use path along the East side of the Eastern Canal from Broadway Rd to Baseline Rd. New asphalt paved pathway, pedestrian lighting, and crosswalk improvements. New lighting connected to existing electrical power. Results in CofC.
NTT Data Centers: +/- 6,000 cubic yard stockpile
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
AFP26-01284 Replacing the main circuit breaker to SES-1 to fix the current conditions of the service entrance.
Fire Alarm, New CO2 monitoring system with tie-in to shell FACP.
Fire Alarm, New CO2 monitoring system to monitor for leaks in the liquid carbon dioxide system.
Applying for building permit to repair and re-energize damaged meter
Permit by Inspection to verify occupancy classification for (F-1) & (B) Occupancy. 5047 s.f. Fabrication Shop. VB Construction. Max 33 occupants. No work under this permit. Inspection required.
Place Fiber Vault and Stub in ROW
This permit includes (4) new 2-inch domestic water meters. Results in CoC.
Install new 200 feet of 3/4-in PE gas line for a future bbq grill at new semi-public pool (PMT26-08154) in an existing housing community. New gas line to be installed in a 4-inch PVC gas sleeve. Results in CofC.
Modify existing fire alarm system by adding (6) ceiling-mounted horn/strobes, (1) ceiling-mounted weather-proof horn/strobe, (2) ceiling-mounted strobes, and modules for duct detectors, duct smoke detectors and kitchen hood for tenant improvement. Ref: PMT26-00479.
Install electrical infrastructure and chargers for COM Fleet electric vehicles at EMSC. New 3-phase electric meter.
No work is being done on this property, There were sprinklers put inside the offices and determined that there was never a certificate of occupancy done on this and it was built in 1970's
Construct new 5 story 164 guestroom hotel
AFP26-01281 PROJECT IS TO REPLACE THE EXISTING EP LAB EQUIPMENT WITH A SIEMENS SOMATOM EQUIPMENT. IN ADDITION, A NEW 1,217 SQ. FT.SYSTEM COMPONENT EQUIPMENT ROOM WILL BE ADDED WITH A ROOM REFRESH.
20 sprinkler heads. Related to PMT26-02932.
Remove existing sand (1,295 SF) and sidewalk (7,465 SF) at an existing City of Mesa park. New ADA ramp, sidewalk, park benches, and playground surfaces. New electrical provided for lights at future canopies. Existing electrical meter and panel 200A. Playground equipment and canopies to be installed under separate permits. Results in CofC.
The Church has decided to further enhance the exteriors of Buildings A and B that front Broadway Road from what was previously approved to include arches around windows, parapet style screen walls to hide the existing roofs and ground mounted mechanical equipment and enhanced landscaping and paving in the center courtyard.
Electrical Service Upgrade
Project includes installing eight fueling dispensers beneath a canopy and a 1,556 SF convenience store.
Electronic access control installation and fire alarm tie-in.
Civil improvements for a new 1,840 Angie's Prime Grill drive-thru restaurant with associated parking, grading, drainage, landscape, lighting, and utility improvements. Water meter: 1-inch Irrigation. REF: PMT24-19661 for new construction of building. Per approval of ZON24-00066 a parking reduction was approved to 8 parking spaces total.
Group S-1 Occupancy. Type V-B Construction. 2,989 SF. Occupant Load 13. New building with a main and lower level used for car oil changes. Special Inspections for expansion/epoxy anchors, concrete construction, masonry construction, steel construction-welding, soils, EIFS, and wood construction. New 2 inch domestic and 3/4 inch landscape water meters. New 400A 3 phase electrical meter. Deferred fire sprinklers, fire alarm, pre-fabricated wood trusses, steel canopy. Results in CoO.
New gable roof facade with new light at entrance to existing building. New structural, architectural, and electrical. Special inspections required: concrete construction and masonry construction. Results in CoC.
Addition of 9,456 SF, type VB, S-2 occupancy to existing 17,100 SF, type VB, M, B and S-2 occupancy building. Scope includes grading & drainage, landscaping. Special inspections req. - anchors, steel concrete, masonry. Deferred: Steel joist and steel joist girders. Deferred fire sprinklers and fire alarms. Approved with stipulations: See comments. Results in CoO.