Search Permits
20,114 results · type: electrical
INSTALLATION OF A 60 AMP CIRCUIT BREAKER FOR A CHARGEPOINT HOME FLEX VEHICLE CHARGER. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2017 NEC AND SRP STANDARDS.
Upgrade existing 200A SES to new 400A SES at existing SFR
THIS PERMIT IS ONLY FOR AN INSTALLATION OF TWO (2) SOLAREDGE ENERGY BANK 10 KWH BATTERY. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. ENERGY BACK UP SYSTEM TO BE INSTALLED PER MANUFACTURE INSTALLATION SPECIFICATIONS AND PER IRC 2018 SECTION R327. PERMIT DOES NOT INCLUDE PV SOLAR SYSTEM INSTALLATION.
“Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.” Install new 200-amp meter panel and breakers.
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
Electrical
Remove 200 amp panel and install an all in one solar ready 400 amp panel
DESERT UPLANDS - TEMPORARY CONSTRUCTION FENCE (805 LF) PMT25-07562. INSTALLATION OF 10-FT OF 3/4-IN PE GAS LINE BURIED 18" WITH 18 GAUGE TRACER WIRE FROM EXISTING GAS STUB TO GALVANIZED HARD PIPE. 55-FT OF 3/4-IN GALVANIZED HARD PIPE STRAPPED ABOVE GROUND TO EXISTING RETAINING WALLS TO NEW 40K BTU BBQ AND 25K BTU PIZZA OVEN. ALL GAS LINES TO BE INSTALLED PER 2018 IFGC & COM GAS REQUIREMENTS. COM GAS ENGINEERING (480-644-2909) TO DETERMINE IF THE METER NEEDS TO BE UPGRADED. ALL NEW ELECTRICAL TO
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
Electrical
Electrical
electrical_permit_(r)
Electrical
Electrical
NEW ELECTRIC INSTALL FOR A DETACHED SHED
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(c)
Electrical
This permit is to upgrade to a 225A service panel with a 200A breaker. Installation shall comply with city of mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to distribution equipment. Permit does not include PV solar syste
electrical_permit_(r)
electrical_permit_(c)
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
PERMIT IS ONLY FOR INSTALLATION OF TWO POINT GUARD BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND C
This permit is to upgrade to a 225A service panel with a 200A breaker. Installation shall comply with City of Mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to distribution equipment. Permit does not include PV solar syste
Residential Electrical Repair Like for Like 200AMP - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. NO OTHER WORK - IF ADDITIONAL WORK REQUIRED MUST OBTAIN A PERMIT AND PROVIDE PLANS.