Search Permits
248,074 results
INTERIOR REMODEL -REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MATCH BASE BUILDING EXISTING STANARDS.ALL CONSTRUCTION SHALL BE NON-COMBUSTIBLE. 4. ALL WOOD AND WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED
Esparanza S426 D Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
ePlan: Commercial Expedited Review - Interior Remodel to Existing Energy X Office Building (2575 SF)
Replace panel and meter with permanent pole
ePlan: Expedited Review - Phase 2 - Shell renovations to Atrium Fire Suppression System Smoke Evac System Walkways Int. Storefront Paseo and Restrooms in Section 130 (175935 SF). Total area for Core & Shell (1181697 SF) (142143146147-Level 1 and Level 5 Fire suppression Fire Alarm Emergency lighting and Stairwells o 141144145148 - All Levels - Fire suppression Fire Alarm Emergency lighting and Stairwells)
Interior Remodel - Restrooms - The Unisex Restroom will remain available while the Men & Ladies Room are under Construction. Once they are completed the unisex restroom will be remodeled.
Addition/ remodel to existing 1-stroy duplex residential to include: converting existing duplex into single-family residential; new media room 2 bedroom 1 full bath laundry room mud room; new 2-car garage with shop; Interior remodel. Rolling in expired permit 2017-196449: addressing cv for replacing siding; replace siding
New 1.5 story conditioned accessory structure (shed) with loft
Remodel of tenant space for office
Level 2 EV Charger
Interior Remodel - Office Area Open Office Areas and Breakout Area.
Demo old driveway. Construct new driveway approach of 12 FT and curb/gutter of 16 LF
PB/SH - New Construction 2 story 4 bed 4.5 bath with attached garage and covered porch and patio PUD
Hart - 40-15951 - Install new 7.6 kW rooftop solar system to existing residential only using line side tap only.
Tenant fit out of dog grooming facility. 2026-106107 DA.
Highland 3313 B Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.58 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
Structural Repair Area Exterior Covered Balcony/Patio Walls at existing multi-family building
Caprock S405 C Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of complete existing central heat and air system with or without duct work
Emergency Repair section of 4 Domestic Water line at Travis High School. Work was conducted over the weekend. We would like to have this inspected as soon as possible to cover up this area and have concrete poured back.
Addition Addition of mud room (full scope attached)
Express: Add washer dryer to walkin closet in master bedroom. Add 2 outlets for gas dryer and washer (120 v) plumbing vent.convert bifold closet door to 36*80 door without structural change.in opening Plumbing permit 2026-116251 is active
SMALL PROJECT - interior remodel. replace all missing fireproofing and fire stopping. affected by new construction with fireproofing to match base building existing standards. all construction shall be non-combustible. 4 all wood and wood blocking shall be fire retardant treated.
Interior Remodel - 2 Conference Room Parents Lounge Reception Townhall Break Out Area and Open Office Areas.
BASE: Installing a backup battery system and additional meter socket.
Builder temp loop. Ref: 2025-044443 BP
New construction single-family residential 2-story 5 bedroom 3 bath with covered front porch
Interior non structural remodel of existing office. [7 Day Review]
Replacement of an existing water heater 40gal gas tank located in an attic
Interior remodel of 2100 sqft of existing boxing gym space. Create a new pilates and Yoga studio completed in 1 phase.