Search Permits
248,074 results
7 DAY - involves building 2-hour walls around the existing boilers to create a dedicated boiler room inside the existing CUP remove the indoor domestic water storage tank and install a new domestic water storage tank on new concrete pad outside of the CUP - OVA
Interior Remodel - The Unisex Restroom will remain available while the Men & Ladies Room are under construction. Once they are completed the Unisex Restroom will be remodeled.
Express: roof repair electrical repair drywall/insulation repair exempt work (cabinets/flooring) REVISION: Add Mechanical and Plumbing Permits
Express: 2nd floor renovation to include plumbing for replacement of tub and surround toilet faucets and vanities in relocation of fixtures updating the electrical to meet current code new tile and laminate flooring to be installed replace vent fan in bath
New accessory structure No sink outside of bathroom. Not a dwelling.
Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system
Installing a new irrigation system
CHANGE OF USE RETAIL TO RESTAURANT will be a small primarily grab and go QSR see operations document attached for more detailed information
ePlan: Commercial Expedited Review - New Apartments also contains 3rd Floor (Level 1 Plans) Fitness Lounge Business Center and Activity Center and 7th Floor Lounge (Level 5 Plans).
New two-story SFR *PRODUCTION BUILDER- SMART HOUSING / GREEN BUILDING* 4 bed 3.5 bath with attached garage front covered porch rear covered patio
200A Underground Service Upgrade.
Porch enclosure
gas line reroute in garage space
Addition Addition of mud room (full scope attached)
Interior Remodel - Changing internal walls per architectural plan running new electrical plumbing and HVAC. Replacing sidings windows remodel bathrooms and kitchen retile and resurface bathrooms new cabinets and appliances replace flooring drywall doors trims replace AC units. Demo shed. Replacing deck. Landscaping. Replacing Driveway.
Removal of underground fuel storage tank and installation of an above ground fuel storage tank. UST Permit to be applied for through the COA UST department.
Replacement of complete existing central heat and air system with or without duct work
Sheldon S403 A Left New - 2 Story SFR w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Sewer line replacement Inspection
New construction accessory use in-ground pool.
*Green Building* New 2-story 3 bedroom 2.5 bathroom single family residence with covered front porch and rear covered patio.
Refresh like and kind for interior finishes drywall ceiling grid lighting paint HVAC and cabinetry following asbestos abatement. Adding 1 interior wall & door to create pantry. Adding 2 electrical outlets in the building for existing AFD Fire Station.
Retail space remodel
New 1 story single family residence with 3 beds 3 baths attached 2-car garage includes a bedroom/bathroom (casita) attached to primary portion of the dwelling via breezeway. Production builder. PUD
Install Level 2 EV Charger
INTERIOR REMODEL -REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MATCH BASE BUILDING EXISTING STANARDS.ALL CONSTRUCTION SHALL BE NON-COMBUSTIBLE. 4. ALL WOOD AND WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED
retroactive permit for an unattached covered deck
Replacement of complete existing central heat and air system with or without duct work
New construction of 2-story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
Express: Replacement of 4 windows like for like