Search Permits
20,914 results · type: plumbing
Installing a 24Kw Generac generator. Electric conduit and automatic transfer switch. Sub-panel and ATS will be installed in the garage. Gas line from main gas meter 1-1/4" to the generator 327,000 BTU. Installing behind side gate. Transiting surface mount to underground to where generator will sit.
plumbing
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Remove cultured marble shower walls, bathtub, curtain rod, shower trim and plumbing, toilet, tile flooring, door, baseboard, vanity, countertop, backsplash, and faucets. Install 3-wall shower surround, low-profile shower pan, corner shelves, window kit with cap, grab bar, shower trim, corner seat, sliding glass door, flooring, baseboard, pocket door, drywall, vanity, countertop, and faucets at existing SFR. No change to square footage.
Replace existing tub/shower to shower with acrylic base and walls. Replace fixture and valve. Only working in wet space. No electrical work.
INSTALLATION OF 85-FT OF 1-IN PE GAS LINE BURIED 18-IN WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 100K BTU FIREPIT. ALL GAS LINES TO BE INSTALLED PER 2018 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.