Search Permits
183,551 results
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
Replacement of complete existing central heat and air system with or without duct work 1 system: 5 Ton Variable Speed Condenser evaporator coil and gas furnace
Install Irrigation System
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 1-STORY 4 BEDROOM WITH 3 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - First Time Finish out for Office Space.
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. (5) Applications submitted Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Little Caesars Channel Letters - Raceway
Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructu
New 1-story single family residence 3 bedroom/2 bathroom with attached garage covered porch and covered patio
The project includes a 400-amp transocket meter mounted on a service rack. 2026-057697 EP is the main electrical permit number. ref BP: 2026-057697 BP
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor.
temporary t-pole for new construction for Easton Park Ref: 2026-046482 BP
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demod space