Search Permits
183,019 results
Replacing HVAC system with new upgraded version. Involves new exterior pad new wall penetrations for larger ducts new ceiling tiles in specific areas and new air registers.
THE SCOPE OF THIS PROJECT WILL BE ADDING 293.47 SQF DEAD TIRE STORAGE AND RELOCATE TRASH ENCLOSED.
Express: Remodel to duplex for window replacement (like for like) sheetrock repairs and replacement of electrical outlets interior painting.
Drywall kitchen bathrooms flooring & painting due to Fire/Water Damage for 5 Units Unit 302
QT - Design furnish and install 9 retaining walls at existing school - OVA
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
Express: Foundation repair - Installing 19 pilings
Demolition of interior cmu walls hvac metal roof panel and aluminum storefront. New interior cmu wall hvac roof insulation TPO roof and aluminum storefront.
NEW 1 STORY SINGLE-FAMILY RESIDENCE ATTACHED GARAGE COVERED PORCH AND PATIO. 4 BED 2 BATH.
Replacement of any self-contained packaged units REMOVE & REPLACE LOBBY RTU WITH LIKE FOR LIKE * POPEYES
Replacement of complete existing central heat and air system with or without duct work replacement of hvac system
Total demo of sfr 1779 sqft circa 1939
new 200 amp overhead electrical service
Interior remodel of bathroom in single family residence: Removing existing tub relocating tub valve and installing free standing tub with drain demo and rebuild of existing shower and pan using water proofing lining material and tile new tile flooring relocate electrical for damp rated recessed fixture in ceiling above tub.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
200amp main service upgrade adding grounding and surge protection Austin Energy is the electrical provider
Retroactively permit detached 1-story accessory structure (MP and EP only)
EXPRESS: Foundation repair
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION.2-STORY 4 BEDROOM WITH 2.5 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO
*Partial Demo* Interior remodel
interior non structural demolition
Abilene S402 B Right New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of complete existing central heat and air system with or without duct work master bedroom system only
Replacement of complete existing central heat and air system with or without duct work
Connect Mobile Home with decks 80 sq ft
Install a 200-amp automatic transfer switch and a customer-provided generator
Total demo of detached garage 298 SqFt circa 1949
Unit A/Unit 49 - New construction of duplex condo each with 3 beds 2.5 baths and attached 2 car garage
EXPRESS: Replace cast iron drains with PVC 2 bath valves 3 sink valves 2 toilet valves washing machine valve windows and exterior doors like for like
Replacement of complete existing central heat and air system with or without duct work CHANGING OUT ONE GAS HVAC SYSTEM W/O DUCT WORK