Search Permits
11,718 results · type: mechanical
TENANT IMPROVEMENT REMODEL OF AN EXISTING REI RETAIL SPACE. WORK INCLUDES: REPLACEMENT OF RETAIL FIXTURES FINISHES ELECTRICAL AND PLUMBING FIXTURES INCLUDING BUT NOT LIMITED TO RETAIL AREAS CASHIER RESTROOMS STORAGE AREAS AND STORAGE RACKING.
Replacement of complete existing central heat and air system with or without duct work upstairs only
Building 2 Remove and replace 2.5 Ton condenser. Units 3012 3013
Replacement of complete existing central heat and air system with or without duct work
Interior Remodel - Office Area Open Office Areas and Breakout Area.
Replacement of complete existing central heat and air system with or without duct work primary suite system only
Interior Remodel - 2 Conference Room Parents Lounge Reception Townhall Break Out Area and Open Office Areas.
Replacement of complete existing central heat and air system with or without duct work hvac change out
Replacement of complete existing central heat and air system with or without duct work Install 3 ton 15 Seer Gas Upflow system.
ePlan: Commercial Expedited Review - [APPROVED] First Time Finish Out for Floor 1 (16955 SF).
New construction 2-unit use 2-story single-family residential to include: 1st story 1-car garage with office space; 2nd story to include: exterior access stairs studio space with kitchen and full bath.
First-generation tenant build-out of existing shell building for dental office.
Replacement of complete existing central heat and air system with or without duct work Like for like 3 ton vertical gas
Unit A - Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Like for Like 2.5 ton vertical gas
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system
ePlan: Residential Expedited Review - New Construction of 2-Story Single Family Res. [4bed 4bath] with attached garage
Interior Remodel - Game Testing Coffee Bar and Game Observation Room.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4.5bath] with Office Habitable Attic Covered Porch & Covered Patio
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath]. BLDG 2
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 01-1077
Replacement of complete existing central heat and air system with or without duct work Like for Like 2 ton vertical gas w/ ductwork modifications and supply grills
Replacement of complete existing central heat and air system with or without duct work INSTALL NOTES: Replace 2 ton 90% gas system in attic above second floor.
Replacement of complete existing central heat and air system with or without duct work Install 3 Ton 16 Seer gas system.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install 4 Ton 17 Seer Gas System.
Replacement of condenser BLDG 7
Replacement of complete existing central heat and air system with or without duct work