Search Permits
19,814 results · type: electrical
Electrical
Electrical
Replacing 200Amp SES with new 200Amp SES SRP provided drawings moving services from overhead to underground.
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical_permit_(c)
electrical_permit_(r)
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
electrical
electrical
electrical_permit_(c)
electrical_permit_(c)